X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0586012302000

Well Details

Well ID: 0586012302000
Loading map...
Location: 00/02-23-058-01W6/0
Location Alias: 00/02-23-58-01 W6M
Location Alias 2: 00/02-23-058-01 W6/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 6
Range: 01
Section: 23
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ LELAND 2-23-58-1
Operator Name: Tourmaline Oil Corp.
License Number: 0485895
License Date: 2017-10-18
License Status: Issued
Spud Date: 2018-02-17
Final Drill Date: 2018-07-19
Well Total Depth: 5318.00 m
Surface Hole Latitude: 54.022054
Surface Hole Longitude: -118.002324

For data sources see[1][2]

Well History

Date Event
2017-10-18 Obtained License
2018-02-18 Surface Casing Operation Performed
2018-03-06 Direction Drilling Operation Performed - Deviate
2018-03-09 Intermediate Casing Operation Performed
2018-07-13 Direction Drilling Operation Performed - Horizontal
2018-07-14 Well Log Performed
2018-07-15 Well Log Performed
2018-07-18 Well Log Performed
2018-07-19 Finished Drilling
2018-07-19 Well Log Performed
2018-07-19 Well Mode changed to Drilled and Cased
2018-07-21 Production Casing Operation Performed
2018-07-21 Rig Released
2018-08-25 Well Log Performed
2018-09-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-09 Well Began Production
2018-09-09 Well Fluid changed to Gas
2018-09-09 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-07 Trinidad Drilling Ltd. 39 N/A Resumption
2018-02-17 Trinidad Drilling Ltd. 39 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-03-06 1019.10 Deviate (5 - 79 degrees)
2018-07-13 3358.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-09-07 Multi-Stage Fracture 5269.20 5269.30 0
2018-09-07 Multi-Stage Fracture 4690.50 4690.60 0
2018-09-07 Multi-Stage Fracture 4625.00 4625.10 0
2018-09-07 Multi-Stage Fracture 4559.40 4559.50 0
2018-09-07 Multi-Stage Fracture 4493.70 4493.80 0
2018-09-08 Multi-Stage Fracture 4428.50 4428.60 0
2018-09-08 Multi-Stage Fracture 4362.90 4363.00 0
2018-09-08 Multi-Stage Fracture 4297.30 4297.40 0
2018-09-08 Multi-Stage Fracture 4231.70 4231.80 0
2018-09-08 Multi-Stage Fracture 4166.10 4166.20 0
2018-09-08 Multi-Stage Fracture 4100.50 4100.60 0
2018-09-07 Multi-Stage Fracture 5215.30 5215.40 0
2018-09-08 Multi-Stage Fracture 4034.90 4035.00 0
2018-09-08 Multi-Stage Fracture 3969.30 3969.40 0
2018-09-08 Multi-Stage Fracture 3903.70 3903.80 0
2018-09-08 Multi-Stage Fracture 3838.40 3838.50 0
2018-09-08 Multi-Stage Fracture 3760.40 3760.50 0
2018-09-08 Multi-Stage Fracture 3694.80 3694.90 0
2018-09-08 Multi-Stage Fracture 3641.90 3642.00 0
2018-09-08 Multi-Stage Fracture 3588.90 3589.00 0
2018-09-08 Multi-Stage Fracture 3536.00 3536.10 0
2018-09-08 Multi-Stage Fracture 3483.40 3483.50 0
2018-09-07 Multi-Stage Fracture 5149.70 5149.80 0
2018-09-08 Multi-Stage Fracture 3430.90 3431.00 0
2018-09-07 Multi-Stage Fracture 5084.00 5084.10 0
2018-09-07 Multi-Stage Fracture 5018.40 5018.50 0
2018-09-07 Multi-Stage Fracture 4952.80 4952.90 0
2018-09-07 Multi-Stage Fracture 4887.20 4887.30 0
2018-09-07 Multi-Stage Fracture 4821.70 4821.80 0
2018-09-07 Multi-Stage Fracture 4756.10 4756.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-09-07 2018-09-08 3,252 7,825 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.0237 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.1191 N/A
silica crystalline 14808-60-7 100 3.1191 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 12.7384 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.5133 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0092 N/A
dibromoacetonitrile 3252-43-5 100 0.0092 N/A
non-hazardous ingredients Not Available 100 0.0092 N/A
polyethylene glycol 25322-68-3 100 0.0092 N/A
sodium bromide 7647-15-6 100 0.0092 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0882 N/A
water Not Available 100 0.0882 N/A
FR-22 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0468 N/A
distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0468 N/A
non-hazardous ingredients Not Available 100 0.0468 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0399 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0399 N/A
methanol 67-56-1 100 0.0399 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0399 N/A
non-hazardous ingredients Not Available 100 0.0399 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-09-07 2018-09-08 Surface Water - Runoff 7157
2018-09-08 2018-09-08 Recycled Fracturing Water (treated at well site) 668

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2684 0.0 0.0 0.0
2019 8655 0.0 0.0 0.0
2020 1887 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-19 No Incident Encountered 0.00 0.00
2018-09-27 No Incident Encountered 0.00 0.00

For data sources see[10]

References