X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0586011616000

Well Details

Well ID: 0586011616000
Loading map...
Location: 00/16-16-058-01W6/0
Location Alias: 00/16-16-58-01 W6M
Location Alias 2: 00/16-16-058-01 W6/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 6
Range: 01
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: CNRL SMOKY 16-16-58-1
Operator Name: Canadian Natural Resources Limited
License Number: 0427441
License Date: 2010-12-09
License Status: Issued
Spud Date: 2011-01-08
Final Drill Date: 2011-01-30
Well Total Depth: 3455.00 m
Surface Hole Latitude: 54.021614
Surface Hole Longitude: -118.082721

For data sources see[1][2]

Well History

Date Event
2010-12-09 Obtained License
2011-01-11 Surface Casing Operation Performed
2011-01-15 Direction Drilling Operation Performed - Deviate
2011-01-21 Well Log Performed
2011-01-28 Well Log Performed
2011-01-30 Finished Drilling
2011-01-30 Well Log Performed
2011-01-30 Well Mode changed to Drilled and Cased
2011-01-31 Well Log Performed
2011-02-02 Production Casing Operation Performed
2011-02-02 Rig Released
2011-02-10 Perforation Treatment Performed - Jet Perforation
2011-02-10 Well Log Performed
2011-02-13 Perforation Treatment Performed - Fractured
2011-02-14 Perforation Treatment Performed - Jet Perforation
2011-02-14 Well Log Performed
2011-02-15 Perforation Treatment Performed - Fractured
2011-02-16 Well Log Performed
2011-02-17 Perforation Treatment Performed - Fractured
2011-02-17 Perforation Treatment Performed - Jet Perforation
2011-02-18 Well Log Performed
2011-02-21 Perforation Treatment Performed - Jet Perforation
2011-02-21 Well Log Performed
2011-02-24 Perforation Treatment Performed - Fractured
2011-03-19 Well Began Production
2011-03-19 Well Fluid changed to Gas
2011-03-19 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-15 1205.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-10 Perforation 3377.00 3377.50 8
2011-02-15 Fracture 3172.50 3245.00 0
2011-02-17 Fracture 2854.50 2889.00 0
2011-02-17 Perforation 2854.50 2855.00 8
2011-02-17 Fracture 2821.50 2822.00 0
2011-02-17 Perforation 2821.50 2822.00 6
2011-02-17 Perforation 2882.00 2882.50 8
2011-02-17 Perforation 2888.50 2889.00 6
2011-02-17 Perforation 2861.50 2862.00 6
2011-02-17 Perforation 2870.50 2871.00 6
2011-02-21 Perforation 2400.00 2400.50 14
2011-02-10 Perforation 3401.00 3401.50 8
2011-02-21 Perforation 2405.50 2408.50 7
2011-02-24 Fracture 2400.00 2408.50 0
2011-02-13 Fracture 3377.00 3401.50 0
2011-02-14 Perforation 3172.50 3173.00 10
2011-02-14 Perforation 3030.50 3031.00 8
2011-02-14 Perforation 3192.00 3192.50 10
2011-02-14 Perforation 3244.50 3245.00 8
2011-02-14 Perforation 3225.00 3225.50 10
2011-02-15 Fracture 3030.50 3031.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6888 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8735 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References