X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585272416002

Well Details

Well ID: 0585272416002
Loading map...
Location: 00/16-24-058-27W5/2
Location Alias: 00/16-24-58-27 W5M
Location Alias 2: 00/16-24-058-27 W5/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 27
Section: 24
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ LELAND 16-24-58-27
Operator Name: XTO Energy Canada ULC
License Number: 0435218
License Date: 2011-07-18
License Status: Amended
Spud Date: 2011-10-22
Final Drill Date: 2011-12-21
Well Total Depth: 5493.00 m
Surface Hole Latitude: 54.015737
Surface Hole Longitude: -117.868232

For data sources see[1][2]

Well History

Date Event
2011-07-18 Obtained License
2011-10-25 Surface Casing Operation Performed
2011-11-04 Intermediate Casing Operation Performed
2011-11-27 Direction Drilling Operation Performed - Horizontal
2011-12-04 Production Casing Operation Performed
2011-12-21 Finished Drilling
2011-12-21 Well Log Performed
2011-12-21 Well Mode changed to Drilled and Cased
2011-12-24 Liner Casing Operation Performed
2011-12-24 Perforation Treatment Performed - Open-Hole Completion
2011-12-26 Rig Released
2012-01-20 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-22 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-25 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-28 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-30 Well Fluid changed to Gas
2012-01-30 Well Mode changed to Testing
2012-09-23 Well Began Production
2012-09-23 Well Fluid changed to Gas
2012-09-23 Well Mode changed to Flowing
2015-05-19 Well Fluid changed to Gas
2015-05-19 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-27 3257.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-24 Open Hole/Barefoot Completion 5489.00 5493.00 0
2012-01-26 Multi-Stage Fracture 4296.80 4298.50 0
2012-01-27 Multi-Stage Fracture 4038.90 4040.60 0
2012-01-27 Multi-Stage Fracture 3917.20 3918.80 0
2012-01-28 Multi-Stage Fracture 3781.20 3782.80 0
2012-01-28 Multi-Stage Fracture 3659.50 3661.20 0
2012-01-28 Multi-Stage Fracture 3523.30 3525.00 0
2012-01-28 Multi-Stage Fracture 3417.10 3418.70 0
2012-01-20 Multi-Stage Fracture 5465.90 5467.20 0
2012-01-22 Multi-Stage Fracture 5206.90 5208.60 0
2012-01-22 Multi-Stage Fracture 5067.10 5068.70 0
2012-01-24 Multi-Stage Fracture 4947.40 4947.70 0
2012-01-24 Multi-Stage Fracture 4815.30 4815.60 0
2012-01-25 Multi-Stage Fracture 4691.30 4692.90 0
2012-01-25 Multi-Stage Fracture 4555.20 4556.80 0
2012-01-25 Multi-Stage Fracture 4432.80 4434.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1448 0.0 0.0 0.0
2013 7750 0.0 0.0 0.0
2014 7820 0.0 0.0 0.0
2015 6441 0.0 0.0 0.0
2016 7275 0.0 0.0 0.0
2017 7070 0.0 0.0 0.0
2018 590 0.0 0.0 0.0
2019 465 0.0 0.0 0.0
2020 1581 0.0 0.0 0.0

For data sources see[6]

References