X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585272407000

Well Details

Well ID: 0585272407000
Loading map...
Location: 00/07-24-058-27W5/0
Location Alias: 00/07-24-58-27 W5M
Location Alias 2: 00/07-24-058-27 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 27
Section: 24
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ LELAND 7-24-58-27
Operator Name: Tourmaline Oil Corp.
License Number: 0495271
License Date: 2019-07-26
License Status: Amended
Spud Date: 2019-12-26
Final Drill Date: 2020-01-23
Well Total Depth: 5354.00 m
Surface Hole Latitude: 54.025195
Surface Hole Longitude: -117.914728

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2020-01-16 2850.40 Deviate (5 - 79 degrees)
2020-01-18 3205.80 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-03-01 Multi-Stage Fracture 5265.00 5265.10 0
2020-03-02 Multi-Stage Fracture 4458.00 4458.10 0
2020-03-02 Multi-Stage Fracture 4405.10 4405.20 0
2020-03-02 Multi-Stage Fracture 4352.10 4352.20 0
2020-03-02 Multi-Stage Fracture 4299.20 4299.30 0
2020-03-02 Multi-Stage Fracture 4246.20 4246.30 0
2020-03-02 Multi-Stage Fracture 4193.20 4193.30 0
2020-03-02 Multi-Stage Fracture 4140.20 4140.30 0
2020-03-02 Multi-Stage Fracture 4087.40 4087.50 0
2020-03-02 Multi-Stage Fracture 4021.80 4021.90 0
2020-03-02 Multi-Stage Fracture 3867.40 3867.50 0
2020-03-02 Multi-Stage Fracture 5147.70 5147.80 0
2020-03-02 Multi-Stage Fracture 3789.10 3789.20 0
2020-03-02 Multi-Stage Fracture 3723.50 3723.60 0
2020-03-03 Multi-Stage Fracture 3645.20 3645.30 0
2020-03-03 Multi-Stage Fracture 3592.20 3592.30 0
2020-03-03 Multi-Stage Fracture 3539.20 3539.30 0
2020-03-03 Multi-Stage Fracture 3487.10 3487.20 0
2020-03-03 Multi-Stage Fracture 3434.10 3434.20 0
2020-03-03 Multi-Stage Fracture 3381.20 3381.30 0
2020-03-03 Multi-Stage Fracture 3328.80 3328.90 0
2020-03-03 Multi-Stage Fracture 3276.30 3276.40 0
2020-03-02 Multi-Stage Fracture 5094.80 5094.90 0
2020-03-03 Multi-Stage Fracture 3223.90 3224.00 0
2020-03-03 Multi-Stage Fracture 3134.00 3134.10 0
2020-03-02 Multi-Stage Fracture 5041.80 5041.90 0
2020-03-02 Multi-Stage Fracture 4988.80 4988.90 0
2020-03-02 Multi-Stage Fracture 4936.00 4936.10 0
2020-03-02 Multi-Stage Fracture 4883.00 4883.10 0
2020-03-02 Multi-Stage Fracture 4830.60 4830.70 0
2020-03-02 Multi-Stage Fracture 4777.60 4777.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 528 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-12-27 Lost Circulation 30.00 47.00
2020-03-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References