X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585272110020

Well Details

Well ID: 0585272110020
Loading map...
Location: 02/10-21-058-27W5/0
Location Alias: 02/10-21-58-27 W5M
Location Alias 2: 02/10-21-058-27 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 27
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ LELAND 10-21-58-27
Operator Name: Tourmaline Oil Corp.
License Number: 0496556
License Date: 2019-11-22
License Status: Amended
Spud Date: 2020-02-01
Final Drill Date: 2020-02-14
Well Total Depth: 4797.00 m
Surface Hole Latitude: 54.031626
Surface Hole Longitude: -117.988224

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-02-01 Nabors Drilling Canada Limited 16 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-02-10 2974.70 Deviate (5 - 79 degrees)
2020-02-11 3280.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-03-06 Multi-Stage Fracture 4721.90 4722.00 0
2020-03-06 Multi-Stage Fracture 4263.70 4263.80 0
2020-03-06 Multi-Stage Fracture 4211.50 4211.60 0
2020-03-06 Multi-Stage Fracture 4159.80 4159.90 0
2020-03-06 Multi-Stage Fracture 4107.20 4107.30 0
2020-03-06 Multi-Stage Fracture 4054.50 4054.60 0
2020-03-06 Multi-Stage Fracture 4001.90 4002.00 0
2020-03-06 Multi-Stage Fracture 3950.00 3950.10 0
2020-03-06 Multi-Stage Fracture 3897.30 3897.40 0
2020-03-07 Multi-Stage Fracture 3845.30 3845.40 0
2020-03-07 Multi-Stage Fracture 3793.00 3793.10 0
2020-03-06 Multi-Stage Fracture 4680.30 4680.40 0
2020-03-07 Multi-Stage Fracture 3740.30 3740.40 0
2020-03-07 Multi-Stage Fracture 3687.70 3687.80 0
2020-03-07 Multi-Stage Fracture 3634.80 3634.90 0
2020-03-07 Multi-Stage Fracture 3582.30 3582.40 0
2020-03-07 Multi-Stage Fracture 3530.00 3530.10 0
2020-03-07 Multi-Stage Fracture 3477.30 3477.40 0
2020-03-07 Multi-Stage Fracture 3424.80 3424.90 0
2020-03-07 Multi-Stage Fracture 3372.00 3372.10 0
2020-03-07 Multi-Stage Fracture 3319.40 3319.50 0
2020-03-07 Multi-Stage Fracture 3266.50 3266.60 0
2020-03-06 Multi-Stage Fracture 4627.50 4627.60 0
2020-03-07 Multi-Stage Fracture 3239.10 3239.20 0
2020-03-06 Multi-Stage Fracture 4575.80 4575.90 0
2020-03-06 Multi-Stage Fracture 4524.10 4524.20 0
2020-03-06 Multi-Stage Fracture 4472.40 4472.50 0
2020-03-06 Multi-Stage Fracture 4420.10 4420.20 0
2020-03-06 Multi-Stage Fracture 4368.10 4368.20 0
2020-03-06 Multi-Stage Fracture 4315.60 4315.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 576 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-01 Lost Circulation 85.00 222.00
2020-02-05 Lost Circulation 1500.00 1500.00
2020-03-12 No Incident Encountered 0.00 0.00

For data sources see[7]

References