X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585272109000

Well Details

Well ID: 0585272109000
Loading map...
Location: 00/09-21-058-27W5/0
Location Alias: 00/09-21-58-27 W5M
Location Alias 2: 00/09-21-058-27 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 27
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ LELAND 9-21-58-27
Operator Name: Tourmaline Oil Corp.
License Number: 0484915
License Date: 2017-08-08
License Status: Amended
Spud Date: 2019-01-01
Final Drill Date: 2019-02-04
Well Total Depth: 4883.00 m
Surface Hole Latitude: 54.030742
Surface Hole Longitude: -117.916599

For data sources see[1][2]

Well History

Date Event
2017-08-08 Obtained License
2019-01-02 Surface Casing Operation Performed
2019-01-10 Intermediate Casing Operation Performed
2019-01-29 Direction Drilling Operation Performed - Deviate
2019-02-01 Direction Drilling Operation Performed - Horizontal
2019-02-04 Finished Drilling
2019-02-04 Well Log Performed
2019-02-04 Well Mode changed to Drilled and Cased
2019-02-05 Well Log Performed
2019-02-06 Production Casing Operation Performed
2019-02-06 Rig Released
2019-02-28 Well Log Performed
2019-03-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-08 Well Began Production
2019-03-08 Well Fluid changed to Gas
2019-03-08 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2019-01-29 2809.10 Deviate (5 - 79 degrees)
2019-02-01 3220.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-06 Multi-Stage Fracture 4714.70 4714.80 0
2019-03-06 Multi-Stage Fracture 4248.60 4248.70 0
2019-03-06 Multi-Stage Fracture 4195.60 4195.70 0
2019-03-06 Multi-Stage Fracture 4142.60 4142.70 0
2019-03-06 Multi-Stage Fracture 4089.60 4089.70 0
2019-03-06 Multi-Stage Fracture 4036.60 4036.70 0
2019-03-07 Multi-Stage Fracture 3983.50 3983.60 0
2019-03-07 Multi-Stage Fracture 3930.50 3930.60 0
2019-03-07 Multi-Stage Fracture 3877.90 3878.00 0
2019-03-07 Multi-Stage Fracture 3824.80 3824.90 0
2019-03-07 Multi-Stage Fracture 3771.80 3771.90 0
2019-03-06 Multi-Stage Fracture 4672.80 4672.90 0
2019-03-07 Multi-Stage Fracture 3718.80 3718.90 0
2019-03-07 Multi-Stage Fracture 3665.80 3665.90 0
2019-03-07 Multi-Stage Fracture 3612.80 3612.90 0
2019-03-07 Multi-Stage Fracture 3559.80 3559.90 0
2019-03-07 Multi-Stage Fracture 3507.00 3507.10 0
2019-03-07 Multi-Stage Fracture 3454.50 3454.60 0
2019-03-07 Multi-Stage Fracture 3401.50 3401.60 0
2019-03-07 Multi-Stage Fracture 3348.80 3348.90 0
2019-03-07 Multi-Stage Fracture 3295.90 3296.00 0
2019-03-07 Multi-Stage Fracture 3242.90 3243.00 0
2019-03-06 Multi-Stage Fracture 4619.80 4619.90 0
2019-03-07 Multi-Stage Fracture 3189.90 3190.00 0
2019-03-06 Multi-Stage Fracture 4566.70 4566.80 0
2019-03-06 Multi-Stage Fracture 4513.70 4513.80 0
2019-03-06 Multi-Stage Fracture 4460.70 4460.80 0
2019-03-06 Multi-Stage Fracture 4407.70 4407.80 0
2019-03-06 Multi-Stage Fracture 4354.70 4354.80 0
2019-03-06 Multi-Stage Fracture 4301.70 4301.80 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-06 2019-03-07 3,098 7,918 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.6174 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.2778 N/A
silica crystalline 14808-60-7 100 3.2778 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 11.2591 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.6643 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0101 N/A
dibromoacetonitrile 3252-43-5 100 0.0101 N/A
non-hazardous ingredients Not Available 100 0.0101 N/A
polyethylene glycol 25322-68-3 100 0.0101 N/A
sodium bromide 7647-15-6 100 0.0101 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0861 N/A
water Not Available 100 0.0861 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0454 N/A
non-hazardous ingredients Not Available 100 0.0454 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0395 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0395 N/A
methanol 67-56-1 100 0.0395 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0395 N/A
non-hazardous ingredients Not Available 100 0.0395 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-03-02 2019-03-10 Oilfield Produced Water 3717
2019-03-02 2019-03-10 Groundwater - Non-saline less than or equal to 150m deep 4130

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 6995 0.0 0.0 0.0
2020 1394 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-04 No Incident Encountered 0.00 0.00
2019-03-19 No Incident Encountered 0.00 0.00

For data sources see[9]

References