X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585272108020

Well Details

Well ID: 0585272108020
Loading map...
Location: 02/08-21-058-27W5/0
Location Alias: 02/08-21-58-27 W5M
Location Alias 2: 02/08-21-058-27 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 27
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ 102 LELAND 8-21-58-27
Operator Name: Tourmaline Oil Corp.
License Number: 0495270
License Date: 2019-07-26
License Status: Issued
Spud Date: 2019-12-29
Final Drill Date: 2020-02-13
Well Total Depth: 4661.00 m
Surface Hole Latitude: 54.025194
Surface Hole Longitude: -117.914803

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-02-07 Ensign Drilling Inc. 39 Resumption
2019-12-29 Ensign Drilling Inc. 39 Set Surface

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-02-09 2801.00 Deviate (5 - 79 degrees)
2020-02-11 3211.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-03-03 Multi-Stage Fracture 4601.60 4601.70 0
2020-03-04 Multi-Stage Fracture 4039.00 4039.10 0
2020-03-04 Multi-Stage Fracture 3986.00 3986.10 0
2020-03-04 Multi-Stage Fracture 3933.10 3933.20 0
2020-03-04 Multi-Stage Fracture 3880.20 3880.30 0
2020-03-04 Multi-Stage Fracture 3827.30 3827.40 0
2020-03-04 Multi-Stage Fracture 3774.30 3774.40 0
2020-03-04 Multi-Stage Fracture 3721.40 3721.50 0
2020-03-04 Multi-Stage Fracture 3668.50 3668.60 0
2020-03-04 Multi-Stage Fracture 3615.50 3615.60 0
2020-03-04 Multi-Stage Fracture 3562.80 3562.90 0
2020-03-03 Multi-Stage Fracture 4560.30 4560.40 0
2020-03-04 Multi-Stage Fracture 3509.90 3510.00 0
2020-03-04 Multi-Stage Fracture 3457.30 3457.40 0
2020-03-04 Multi-Stage Fracture 3404.30 3404.40 0
2020-03-04 Multi-Stage Fracture 3352.10 3352.20 0
2020-03-04 Multi-Stage Fracture 3299.80 3299.90 0
2020-03-04 Multi-Stage Fracture 3247.20 3247.30 0
2020-03-04 Multi-Stage Fracture 3195.10 3195.20 0
2020-03-03 Multi-Stage Fracture 4507.90 4508.00 0
2020-03-03 Multi-Stage Fracture 4455.00 4455.10 0
2020-03-03 Multi-Stage Fracture 4402.40 4402.50 0
2020-03-03 Multi-Stage Fracture 4300.10 4300.20 0
2020-03-04 Multi-Stage Fracture 4260.60 4260.70 0
2020-03-04 Multi-Stage Fracture 4207.70 4207.80 0
2020-03-04 Multi-Stage Fracture 4091.90 4092.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 576 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-13 No Incident Encountered 0.00 0.00
2020-03-15 No Incident Encountered 0.00 0.00

For data sources see[7]

References