X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585271908000

Well Details

Well ID: 0585271908000
Loading map...
Location: 00/08-19-058-27W5/0
Location Alias: 00/08-19-58-27 W5M
Location Alias 2: 00/08-19-058-27 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 27
Section: 19
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ LELAND 8-19-58-27
Operator Name: Tourmaline Oil Corp.
License Number: 0493820
License Date: 2019-02-15
License Status: Amended
Spud Date: 2019-12-09
Final Drill Date: 2020-01-07
Well Total Depth: 4915.00 m
Surface Hole Latitude: 54.026709
Surface Hole Longitude: -117.967644

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2020-01-02 2900.60 Deviate (5 - 79 degrees)
2020-01-04 3280.10 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-01-24 Multi-Stage Fracture 4855.60 4855.70 0
2020-01-25 Multi-Stage Fracture 4332.00 4332.10 0
2020-01-25 Multi-Stage Fracture 4275.90 4276.00 0
2020-01-25 Multi-Stage Fracture 4223.80 4223.90 0
2020-01-25 Multi-Stage Fracture 4171.40 4171.50 0
2020-01-25 Multi-Stage Fracture 4119.20 4119.30 0
2020-01-25 Multi-Stage Fracture 4067.80 4067.90 0
2020-01-25 Multi-Stage Fracture 4015.50 4015.60 0
2020-01-25 Multi-Stage Fracture 3964.00 3964.10 0
2020-01-25 Multi-Stage Fracture 3911.60 3911.70 0
2020-01-25 Multi-Stage Fracture 3859.20 3859.30 0
2020-01-25 Multi-Stage Fracture 4809.60 4809.70 0
2020-01-25 Multi-Stage Fracture 3807.00 3807.10 0
2020-01-25 Multi-Stage Fracture 3755.10 3755.20 0
2020-01-26 Multi-Stage Fracture 3703.10 3703.20 0
2020-01-26 Multi-Stage Fracture 3651.20 3651.30 0
2020-01-26 Multi-Stage Fracture 3598.90 3599.00 0
2020-01-26 Multi-Stage Fracture 3546.30 3546.40 0
2020-01-26 Multi-Stage Fracture 3493.80 3493.90 0
2020-01-26 Multi-Stage Fracture 3441.40 3441.50 0
2020-01-26 Multi-Stage Fracture 3389.60 3389.70 0
2020-01-26 Multi-Stage Fracture 3337.70 3337.80 0
2020-01-25 Multi-Stage Fracture 4749.90 4750.00 0
2020-01-26 Multi-Stage Fracture 3285.80 3285.90 0
2020-01-26 Multi-Stage Fracture 3233.60 3233.70 0
2020-01-25 Multi-Stage Fracture 4689.80 4689.90 0
2020-01-25 Multi-Stage Fracture 4631.70 4631.80 0
2020-01-25 Multi-Stage Fracture 4571.70 4571.80 0
2020-01-25 Multi-Stage Fracture 4511.70 4511.80 0
2020-01-25 Multi-Stage Fracture 4451.50 4451.60 0
2020-01-25 Multi-Stage Fracture 4391.60 4391.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 1295 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-07 No Incident Encountered 0.00 0.00
2020-02-05 No Incident Encountered 0.00 0.00

For data sources see[6]

References