If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0585270915020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.004198,"lon":-117.913767,"icon":""}]} |
Location: 02/15-09-058-27W5/0 | |
Location Alias: 02/15-09-58-27 W5M | |
Location Alias 2: 02/15-09-058-27 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 5 | |
Range: 27 | |
Section: 09 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TOURMALINE HZ LELAND 15-9-58-27 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0488440 | |
License Date: 2018-03-05 | |
License Status: Amended | |
Spud Date: 2018-10-12 | |
Final Drill Date: 2018-11-13 | |
Well Total Depth: 5430.00 m | |
Surface Hole Latitude: 54.004198 | |
Surface Hole Longitude: -117.913767 |
Date | Event |
---|---|
2018-03-05 | Obtained License |
2018-10-13 | Surface Casing Operation Performed |
2018-10-30 | Intermediate Casing Operation Performed |
2018-11-03 | Direction Drilling Operation Performed - Deviate |
2018-11-07 | Direction Drilling Operation Performed - Horizontal |
2018-11-07 | Well Log Performed |
2018-11-13 | Finished Drilling |
2018-11-13 | Well Log Performed |
2018-11-13 | Well Mode changed to Drilled and Cased |
2018-11-14 | Production Casing Operation Performed |
2018-11-15 | Rig Released |
2018-12-31 | Well Log Performed |
2019-01-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-10 | Well Began Production |
2019-01-10 | Well Fluid changed to Gas |
2019-01-10 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-10-12 | Trinidad Drilling Ltd. | 39 | N/A | Set Surface |
2018-10-31 | Trinidad Drilling Ltd. | 39 | N/A | Resumption |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-11-03 | 2813.40 | Deviate (5 - 79 degrees) |
2018-11-07 | 3177.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-01-07 | Multi-Stage Fracture | 5372.50 | 5372.60 | 0 |
2019-01-07 | Multi-Stage Fracture | 4793.60 | 4793.70 | 0 |
2019-01-07 | Multi-Stage Fracture | 4728.00 | 4728.10 | 0 |
2019-01-07 | Multi-Stage Fracture | 4662.30 | 4662.40 | 0 |
2019-01-07 | Multi-Stage Fracture | 4597.60 | 4597.70 | 0 |
2019-01-07 | Multi-Stage Fracture | 4531.90 | 4532.00 | 0 |
2019-01-07 | Multi-Stage Fracture | 4467.40 | 4467.50 | 0 |
2019-01-07 | Multi-Stage Fracture | 4401.70 | 4401.80 | 0 |
2019-01-07 | Multi-Stage Fracture | 4336.10 | 4336.20 | 0 |
2019-01-07 | Multi-Stage Fracture | 4270.40 | 4270.50 | 0 |
2019-01-07 | Multi-Stage Fracture | 4204.70 | 4204.80 | 0 |
2019-01-07 | Multi-Stage Fracture | 5317.90 | 5318.00 | 0 |
2019-01-07 | Multi-Stage Fracture | 4139.00 | 4139.10 | 0 |
2019-01-07 | Multi-Stage Fracture | 4073.40 | 4073.50 | 0 |
2019-01-07 | Multi-Stage Fracture | 3982.30 | 3982.40 | 0 |
2019-01-07 | Multi-Stage Fracture | 3879.00 | 3879.10 | 0 |
2019-01-07 | Multi-Stage Fracture | 3800.70 | 3800.80 | 0 |
2019-01-07 | Multi-Stage Fracture | 3747.70 | 3747.80 | 0 |
2019-01-07 | Multi-Stage Fracture | 3694.70 | 3694.80 | 0 |
2019-01-07 | Multi-Stage Fracture | 3641.70 | 3641.80 | 0 |
2019-01-07 | Multi-Stage Fracture | 3588.80 | 3588.90 | 0 |
2019-01-07 | Multi-Stage Fracture | 3535.80 | 3535.90 | 0 |
2019-01-07 | Multi-Stage Fracture | 5252.30 | 5252.40 | 0 |
2019-01-07 | Multi-Stage Fracture | 3482.80 | 3482.90 | 0 |
2019-01-07 | Multi-Stage Fracture | 3429.80 | 3429.90 | 0 |
2019-01-07 | Multi-Stage Fracture | 3376.80 | 3376.90 | 0 |
2019-01-07 | Multi-Stage Fracture | 3323.80 | 3323.90 | 0 |
2019-01-07 | Multi-Stage Fracture | 3270.80 | 3270.90 | 0 |
2019-01-07 | Multi-Stage Fracture | 3217.80 | 3217.90 | 0 |
2019-01-07 | Multi-Stage Fracture | 5187.60 | 5187.70 | 0 |
2019-01-07 | Multi-Stage Fracture | 5121.90 | 5122.00 | 0 |
2019-01-07 | Multi-Stage Fracture | 5056.30 | 5056.40 | 0 |
2019-01-07 | Multi-Stage Fracture | 4990.60 | 4990.70 | 0 |
2019-01-07 | Multi-Stage Fracture | 4925.00 | 4925.10 | 0 |
2019-01-07 | Multi-Stage Fracture | 4859.30 | 4859.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-01-07 | 2019-01-07 | 3,082 | 9,011 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 82.1627 | N/A | |||
Prime Plus 40/70 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 3.2087 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 3.2087 | N/A | ||||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 12.8073 | N/A | ||
Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 1.653 | N/A | ||
AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.01 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.01 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.01 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.01 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.01 | N/A | ||||
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.0779 | N/A | |
water | Not Available | 100 | 0.0779 | N/A | ||||
FR-22 | Trican | Friction Reducer | distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.0438 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0438 | N/A | ||||
S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0361 | N/A | |
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0361 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0361 | N/A | ||||
methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0361 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0361 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-01-05 | 2019-01-07 | Surface Water - River | 1515 |
2019-01-05 | 2019-01-07 | Recycled Fracturing Water (treated at well site) | 3100 |
2019-01-05 | 2019-01-07 | Recycled Fracturing Water (treated at well site) | 1542 |
2019-01-05 | 2019-01-07 | Recycled Fracturing Water (treated at well site) | 1541 |
2019-01-05 | 2019-01-07 | Oilfield Produced Water | 1312 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 8346 | 0.0 | 0.0 | 0.0 |
2020 | 1862 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-11-13 | No Incident Encountered | 0.00 | 0.00 |
2019-01-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]