X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585261813020

Well Details

Well ID: 0585261813020
Loading map...
Location: 02/13-18-058-26W5/0
Location Alias: 02/13-18-58-26 W5M
Location Alias 2: 02/13-18-058-26 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 26
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: CVE ET AL 102 HZ LELAND 13-18-58-26
Operator Name: Cenovus Energy Inc.
License Number: 0484801
License Date: 2017-07-31
License Status: Issued
Spud Date: 2017-09-07
Final Drill Date: 2017-11-12
Well Total Depth: 5034.00 m
Surface Hole Latitude: 54.016021
Surface Hole Longitude: -117.833108

For data sources see[1][2]

Well History

Date Event
2016-11-16 Well Log Performed
2017-07-31 Obtained License
2017-09-08 Surface Casing Operation Performed
2017-10-23 Direction Drilling Operation Performed - Deviate
2017-10-27 Intermediate Casing Operation Performed
2017-11-02 Direction Drilling Operation Performed - Horizontal
2017-11-12 Finished Drilling
2017-11-12 Well Log Performed
2017-11-12 Well Mode changed to Drilled and Cased
2017-11-15 Perforation Treatment Performed - Open-Hole Completion
2017-11-15 Production Casing Operation Performed
2017-11-16 Rig Released
2018-02-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-22 Well Fluid changed to Gas
2018-02-22 Well Mode changed to Testing
2018-02-23 Well Began Production
2018-02-23 Well Fluid changed to Gas
2018-02-23 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-09-07 Beaver Drilling Ltd. 15 N/A Drill To LD
2017-10-19 Beaver Drilling Ltd. 15 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-10-23 2349.50 Deviate (5 - 79 degrees)
2017-11-02 3284.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-11-15 Open Hole/Barefoot Completion 5025.00 5034.00 0
2018-02-07 Multi-Stage Fracture 4424.50 4425.00 0
2018-02-07 Multi-Stage Fracture 4355.20 4355.70 0
2018-02-07 Multi-Stage Fracture 4286.40 4286.90 0
2018-02-07 Multi-Stage Fracture 4216.30 4216.80 0
2018-02-07 Multi-Stage Fracture 4144.50 4145.00 0
2018-02-07 Multi-Stage Fracture 4074.10 4074.60 0
2018-02-07 Multi-Stage Fracture 4003.80 4004.30 0
2018-02-07 Multi-Stage Fracture 3932.20 3932.70 0
2018-02-07 Multi-Stage Fracture 3860.10 3860.60 0
2018-02-07 Multi-Stage Fracture 3788.60 3789.10 0
2018-02-07 Multi-Stage Fracture 4984.00 4984.50 0
2018-02-07 Multi-Stage Fracture 3717.90 3718.40 0
2018-02-08 Multi-Stage Fracture 3647.20 3647.70 0
2018-02-08 Multi-Stage Fracture 3562.40 3562.90 0
2018-02-08 Multi-Stage Fracture 3520.60 3521.10 0
2018-02-07 Multi-Stage Fracture 4923.40 4923.90 0
2018-02-07 Multi-Stage Fracture 4852.60 4853.10 0
2018-02-07 Multi-Stage Fracture 4780.50 4781.00 0
2018-02-07 Multi-Stage Fracture 4709.80 4710.30 0
2018-02-07 Multi-Stage Fracture 4638.20 4638.70 0
2018-02-07 Multi-Stage Fracture 4567.60 4568.10 0
2018-02-07 Multi-Stage Fracture 4495.70 4496.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-07 2018-02-08 3,023 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 86.5054 N/A
Slickwater Schlumberger Quartz. Crystalline silica 14808-60-7 100 4.434 N/A
Slickwater Schlumberger Energizing Fluid 2-hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.1336 N/A
2-Propenamid (impurity) 79-06-1 100 0 N/A
Acetic acid. potassium salt 127-08-2 100 0 N/A
Acrylamide. 2-acrylamido-2-methylpropanesulfonic
acid. sodiu
38193-60-1 100 0.018 N/A
Alcohol. C11-14. ethoxylated 78330-21-9 100 0.0017 N/A
Alcohols. C9-11-iso-. C10-rich 68526-85-2 100 0.0008 N/A
Copper(II) sulfate 7758-98-7 100 0 N/A
Distillates. petroleum. hydrotreated light 64742-47-8 100 0.016 N/A
Ethylene Glycol 107-21-1 100 0.0065 N/A
Glutaraldehyde 111-30-8 100 0.0022 N/A
Methanol (impurity) 67-56-1 100 0 N/A
Sodium chloride 7647-14-5 100 0.0095 N/A
Sodium salt of Polymaleic Acid Copolymer 111560-38-4 100 0.0018 N/A
Sorbitan monooleate 1338-43-8 100 0.0009 N/A
Sorbitan monooleate. ethoxylated 9005-65-6 100 0.0007 N/A
Tetrasodium ethylenediaminetetraacetate 64-02-8 100 0 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-26 2018-02-10 Groundwater - Non-saline less than or equal to 150m deep 956
2018-02-08 2018-02-08 Recycled Fracturing Water (treated at well site) 1000
2018-01-01 2018-01-04 Surface Water - River 8195

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6333 0.0 0.0 0.0
2019 8308 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-16 No Incident Encountered 0.00 0.00
2018-03-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References