X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585261812000

Well Details

Well ID: 0585261812000
Loading map...
Location: 00/12-18-058-26W5/0
Location Alias: 00/12-18-58-26 W5M
Location Alias 2: 00/12-18-058-26 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 26
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: CVE ET AL 100 HZ LELAND 12-18-58-26
Operator Name: Cenovus Energy Inc.
License Number: 0484794
License Date: 2017-07-31
License Status: Issued
Spud Date: 2017-09-04
Final Drill Date: 2017-10-13
Well Total Depth: 4857.00 m
Surface Hole Latitude: 54.016015
Surface Hole Longitude: -117.833260

For data sources see[1][2]

Well History

Date Event
2017-07-31 Obtained License
2017-08-27 Conductor Casing Operation Performed
2017-09-07 Surface Casing Operation Performed
2017-09-25 Intermediate Casing Operation Performed
2017-09-27 Well Log Performed
2017-09-30 Direction Drilling Operation Performed - Deviate
2017-10-03 Direction Drilling Operation Performed - Horizontal
2017-10-13 Finished Drilling
2017-10-13 Well Log Performed
2017-10-13 Well Mode changed to Drilled and Cased
2017-10-16 Production Casing Operation Performed
2017-10-17 Perforation Treatment Performed - Open-Hole Completion
2017-10-17 Rig Released
2017-10-17 Well Log Performed
2018-02-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-07 Well Fluid changed to Gas
2018-02-07 Well Mode changed to Testing
2018-02-14 Well Began Production
2018-02-14 Well Fluid changed to Gas
2018-02-14 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-09-04 Beaver Drilling Ltd. 15 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-09-30 2682.40 Deviate (5 - 79 degrees)
2017-10-03 3156.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-10-17 Open Hole/Barefoot Completion 4847.00 4857.00 0
2018-02-05 Multi-Stage Fracture 4247.90 4248.40 0
2018-02-05 Multi-Stage Fracture 4176.80 4177.30 0
2018-02-06 Multi-Stage Fracture 4090.50 4091.00 0
2018-02-06 Multi-Stage Fracture 4018.80 4019.30 0
2018-02-06 Multi-Stage Fracture 3949.40 3949.90 0
2018-02-06 Multi-Stage Fracture 3876.50 3877.00 0
2018-02-06 Multi-Stage Fracture 3804.80 3805.30 0
2018-02-06 Multi-Stage Fracture 3732.60 3733.10 0
2018-02-06 Multi-Stage Fracture 3661.90 3662.40 0
2018-02-06 Multi-Stage Fracture 3589.10 3589.60 0
2018-02-05 Multi-Stage Fracture 4821.70 4822.20 0
2018-02-06 Multi-Stage Fracture 3517.10 3517.60 0
2018-02-06 Multi-Stage Fracture 3444.40 3444.90 0
2018-02-06 Multi-Stage Fracture 3371.70 3372.20 0
2018-02-06 Multi-Stage Fracture 3328.00 3328.50 0
2018-02-05 Multi-Stage Fracture 4746.80 4747.30 0
2018-02-05 Multi-Stage Fracture 4674.30 4674.80 0
2018-02-05 Multi-Stage Fracture 4591.10 4591.60 0
2018-02-05 Multi-Stage Fracture 4533.70 4534.20 0
2018-02-05 Multi-Stage Fracture 4461.80 4462.30 0
2018-02-05 Multi-Stage Fracture 4390.50 4391.00 0
2018-02-05 Multi-Stage Fracture 4321.30 4321.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-05 2018-02-06 3,033 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 86.9375 N/A
Slickwater Schlumberger Quartz. Crystalline silica 14808-60-7 100 4.286 N/A
Slickwater Schlumberger Energizing Fluid Acrylamide/ammonium acrylate copolymer 26100-47-0 100 0.0274 N/A
2-hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.1367 N/A
2-Propenamid (impurity) 79-06-1 100 0 N/A
Alcohols. C12-14-secondary. ethoxylated 84133-50-6 100 0.0002 N/A
Ammonium chloride 12125-02-9 100 0.0012 N/A
Distillates (petroleum). solvent-dewaxed heavy paraffinic 64742-65-0 100 0.0066 N/A
Distillates. petroleum. hydrotreated light 64742-47-8 100 0.0149 N/A
Ethoxylated oleic acid 9004-96-0 100 0.002 N/A
Ethylene Glycol 107-21-1 100 0.0077 N/A
Glutaraldehyde 111-30-8 100 0.0021 N/A
Methanol (impurity) 67-56-1 100 0 N/A
Sodium salt of Polymaleic Acid Copolymer 111560-38-4 100 0.0022 N/A
Sorbitan monooleate 1338-43-8 100 0.0024 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-01-08 2018-01-12 Surface Water - River 9625
2018-02-06 2018-02-06 Recycled Fracturing Water (treated at well site) 1000

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 4485 0.0 0.0 0.0
2019 8291 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-10-17 No Incident Encountered 0.00 0.00
2018-02-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References