If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0585261812000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.016015,"lon":-117.83326,"icon":""}]} |
Location: 00/12-18-058-26W5/0 | |
Location Alias: 00/12-18-58-26 W5M | |
Location Alias 2: 00/12-18-058-26 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 5 | |
Range: 26 | |
Section: 18 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CVE ET AL 100 HZ LELAND 12-18-58-26 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0484794 | |
License Date: 2017-07-31 | |
License Status: Issued | |
Spud Date: 2017-09-04 | |
Final Drill Date: 2017-10-13 | |
Well Total Depth: 4857.00 m | |
Surface Hole Latitude: 54.016015 | |
Surface Hole Longitude: -117.833260 |
Date | Event |
---|---|
2017-07-31 | Obtained License |
2017-08-27 | Conductor Casing Operation Performed |
2017-09-07 | Surface Casing Operation Performed |
2017-09-25 | Intermediate Casing Operation Performed |
2017-09-27 | Well Log Performed |
2017-09-30 | Direction Drilling Operation Performed - Deviate |
2017-10-03 | Direction Drilling Operation Performed - Horizontal |
2017-10-13 | Finished Drilling |
2017-10-13 | Well Log Performed |
2017-10-13 | Well Mode changed to Drilled and Cased |
2017-10-16 | Production Casing Operation Performed |
2017-10-17 | Perforation Treatment Performed - Open-Hole Completion |
2017-10-17 | Rig Released |
2017-10-17 | Well Log Performed |
2018-02-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-07 | Well Fluid changed to Gas |
2018-02-07 | Well Mode changed to Testing |
2018-02-14 | Well Began Production |
2018-02-14 | Well Fluid changed to Gas |
2018-02-14 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-09-04 | Beaver Drilling Ltd. | 15 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-09-30 | 2682.40 | Deviate (5 - 79 degrees) |
2017-10-03 | 3156.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-10-17 | Open Hole/Barefoot Completion | 4847.00 | 4857.00 | 0 |
2018-02-05 | Multi-Stage Fracture | 4247.90 | 4248.40 | 0 |
2018-02-05 | Multi-Stage Fracture | 4176.80 | 4177.30 | 0 |
2018-02-06 | Multi-Stage Fracture | 4090.50 | 4091.00 | 0 |
2018-02-06 | Multi-Stage Fracture | 4018.80 | 4019.30 | 0 |
2018-02-06 | Multi-Stage Fracture | 3949.40 | 3949.90 | 0 |
2018-02-06 | Multi-Stage Fracture | 3876.50 | 3877.00 | 0 |
2018-02-06 | Multi-Stage Fracture | 3804.80 | 3805.30 | 0 |
2018-02-06 | Multi-Stage Fracture | 3732.60 | 3733.10 | 0 |
2018-02-06 | Multi-Stage Fracture | 3661.90 | 3662.40 | 0 |
2018-02-06 | Multi-Stage Fracture | 3589.10 | 3589.60 | 0 |
2018-02-05 | Multi-Stage Fracture | 4821.70 | 4822.20 | 0 |
2018-02-06 | Multi-Stage Fracture | 3517.10 | 3517.60 | 0 |
2018-02-06 | Multi-Stage Fracture | 3444.40 | 3444.90 | 0 |
2018-02-06 | Multi-Stage Fracture | 3371.70 | 3372.20 | 0 |
2018-02-06 | Multi-Stage Fracture | 3328.00 | 3328.50 | 0 |
2018-02-05 | Multi-Stage Fracture | 4746.80 | 4747.30 | 0 |
2018-02-05 | Multi-Stage Fracture | 4674.30 | 4674.80 | 0 |
2018-02-05 | Multi-Stage Fracture | 4591.10 | 4591.60 | 0 |
2018-02-05 | Multi-Stage Fracture | 4533.70 | 4534.20 | 0 |
2018-02-05 | Multi-Stage Fracture | 4461.80 | 4462.30 | 0 |
2018-02-05 | Multi-Stage Fracture | 4390.50 | 4391.00 | 0 |
2018-02-05 | Multi-Stage Fracture | 4321.30 | 4321.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-02-05 | 2018-02-06 | 3,033 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water (Including Mix Water Supplied by Client)* | Not Available | 100 | 86.9375 | N/A | |||
Slickwater | Schlumberger | Quartz. Crystalline silica | 14808-60-7 | 100 | 4.286 | N/A | ||
Slickwater | Schlumberger | Energizing Fluid | Acrylamide/ammonium acrylate copolymer | 26100-47-0 | 100 | 0.0274 | N/A | |
2-hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.1367 | N/A | ||||
2-Propenamid (impurity) | 79-06-1 | 100 | 0 | N/A | ||||
Alcohols. C12-14-secondary. ethoxylated | 84133-50-6 | 100 | 0.0002 | N/A | ||||
Ammonium chloride | 12125-02-9 | 100 | 0.0012 | N/A | ||||
Distillates (petroleum). solvent-dewaxed heavy paraffinic | 64742-65-0 | 100 | 0.0066 | N/A | ||||
Distillates. petroleum. hydrotreated light | 64742-47-8 | 100 | 0.0149 | N/A | ||||
Ethoxylated oleic acid | 9004-96-0 | 100 | 0.002 | N/A | ||||
Ethylene Glycol | 107-21-1 | 100 | 0.0077 | N/A | ||||
Glutaraldehyde | 111-30-8 | 100 | 0.0021 | N/A | ||||
Methanol (impurity) | 67-56-1 | 100 | 0 | N/A | ||||
Sodium salt of Polymaleic Acid Copolymer | 111560-38-4 | 100 | 0.0022 | N/A | ||||
Sorbitan monooleate | 1338-43-8 | 100 | 0.0024 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-01-08 | 2018-01-12 | Surface Water - River | 9625 |
2018-02-06 | 2018-02-06 | Recycled Fracturing Water (treated at well site) | 1000 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 4485 | 0.0 | 0.0 | 0.0 |
2019 | 8291 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-10-17 | No Incident Encountered | 0.00 | 0.00 |
2018-02-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]