X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585261110004

Well Details

Well ID: 0585261110004
Loading map...
Location: 00/10-11-058-26W5/4
Location Alias: 00/10-11-58-26 W5M
Location Alias 2: 00/10-11-058-26 W5/04
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 26
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: CVE LELAND 10-11-58-26
Operator Name: Cenovus Energy Inc.
License Number: 0215738
License Date: 1998-06-10
License Status: Issued
Spud Date: 1998-06-27
Final Drill Date: 1998-09-13
Well Total Depth: 3950.00 m
Surface Hole Latitude: 54.000323
Surface Hole Longitude: -117.752903

For data sources see[1][2]

Well History

Date Event
1998-06-10 Obtained License
1998-06-28 Lost Circulation Occurred
1998-07-02 Surface Casing Operation Performed
1998-07-06 Lost Circulation Occurred
1998-07-21 Well Log Performed
1998-08-07 Well Log Performed
1998-08-14 Lost Circulation Occurred
1998-08-17 Intermediate Casing Operation Performed
1998-08-18 Well Log Performed
1998-08-29 Lost Circulation Occurred
1998-09-13 Finished Drilling
1998-09-13 Well Mode changed to Drilled and Cased
1998-09-20 Liner Casing Operation Performed
1998-09-24 Rig Released
1998-10-17 Well Log Performed
1998-10-18 Perforation Treatment Performed - Jet Perforation
1998-10-18 Well Log Performed
1998-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-30 Perforation Treatment Performed - Jet Perforation
1998-10-30 Plug Back Performed
1998-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-11-06 Well Log Performed
1998-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-07 Plug Back Performed
1999-01-09 Perforation Treatment Performed - Jet Perforation
1999-01-09 Well Log Performed
2004-10-18 Perforation Treatment Performed - Cement Squeeze
2004-10-18 Plug Back Performed
2004-10-29 Well Log Performed
2004-10-30 Perforation Treatment Performed - Jet Perforation
2004-11-01 Perforation Treatment Performed - Fractured
2004-11-02 Well Fluid changed to Gas
2004-11-02 Well Mode changed to Testing
2005-02-14 Well Began Production
2005-02-14 Well Fluid changed to Gas
2005-02-14 Well Mode changed to Flowing
2005-12-01 Well Fluid changed to Gas
2005-12-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-10-18 Perforation 3840.00 3847.00 13
2004-11-01 Fracture 3098.00 3103.00 0
1998-10-30 Packing Device Capped w/Cement 3792.00 3800.00 0
1998-10-30 Perforation 3768.00 3770.00 14
1998-11-03 Acid Treatment 3768.00 3770.00 0
1998-11-07 Packing Device Capped w/Cement 3712.00 3720.00 0
1998-11-07 Packing Device Capped w/Cement 2272.00 2280.00 0
1999-01-09 Perforation 2187.00 2192.00 0
2004-10-18 Cement Squeeze 2187.00 2192.00 0
2004-10-30 Perforation 3098.00 3103.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 84 0.0 0.0 0.0
2005 6556 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8447 0.0 0.0 0.0
2008 8711 0.0 0.0 0.0
2009 7031 0.0 0.0 0.0
2010 6429 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 5569 0.0 0.0 0.0
2013 8016 0.0 0.0 0.0
2014 8736 0.0 0.0 0.0
2015 8654 0.0 0.0 0.0
2016 8540 0.0 0.0 0.0
2017 8363 0.0 0.0 0.0
2018 8072 0.0 0.0 0.0
2019 7873 0.0 0.0 0.0
2020 1902 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1998-06-28 Lost Circulation 68.00 104.00
1998-07-06 Lost Circulation 934.00 934.00
1998-08-14 Lost Circulation 3262.00 3262.00
1998-08-29 Lost Circulation 3520.00 3520.00

For data sources see[6]

References