X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585253006002

Well Details

Well ID: 0585253006002
Loading map...
Location: 00/06-30-058-25W5/2
Location Alias: 00/06-30-58-25 W5M
Location Alias 2: 00/06-30-058-25 W5/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 25
Section: 30
County/Municipality: Municipal District of Greenview No. 16
Well Name: CNRES BERLRW 6-30-58-25
Operator Name: Canadian Natural Resources Limited
License Number: 0276897
License Date: 2002-11-27
License Status: Suspension
Spud Date: 2003-02-12
Final Drill Date: 2003-03-11
Well Total Depth: 3166.00 m
Surface Hole Latitude: 54.042158
Surface Hole Longitude: -117.710135

For data sources see[1][2]

Well History

Date Event
2002-11-27 Obtained License
2003-02-15 Surface Casing Operation Performed
2003-03-11 Finished Drilling
2003-03-11 Well Mode changed to Drilled and Cased
2003-03-12 Well Log Performed
2003-03-14 Production Casing Operation Performed
2003-03-14 Rig Released
2003-03-23 Perforation Treatment Performed - Jet Perforation
2003-03-26 Perforation Treatment Performed - Fractured
2003-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-12-08 Plug Back Performed
2003-12-08 Well Log Performed
2003-12-10 Perforation Treatment Performed - Jet Perforation
2003-12-10 Well Log Performed
2003-12-17 Perforation Treatment Performed - Fractured
2004-01-18 Well Fluid changed to Crude Oil
2004-01-18 Well Mode changed to Potential
2004-07-01 Well Began Production
2004-07-01 Well Fluid changed to Gas
2004-07-01 Well Mode changed to Flowing
2013-09-30 Well Fluid changed to Gas
2013-09-30 Well Mode changed to Suspended
2015-03-01 Well Fluid changed to Gas
2015-03-01 Well Mode changed to Flowing
2016-03-31 Well Fluid changed to Gas
2016-03-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-03-23 Perforation 3093.00 3096.00 17
2003-03-23 Perforation 3098.00 3099.00 17
2003-03-26 Fracture 3093.00 3099.00 0
2003-12-08 Packing Device Capped w/Cement 3078.00 3086.00 0
2003-12-10 Perforation 2179.00 2183.50 17
2003-12-17 Fracture 2179.00 2183.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 441 0.0 0.0 0.0
2005 6431 0.0 0.0 0.0
2006 6660 0.0 0.0 0.0
2007 8589 0.0 0.0 0.0
2008 8348 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8039 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 6671 0.0 0.0 0.0
2013 24 0.0 0.0 0.0
2015 144 0.0 0.0 0.0

For data sources see[5]

References