X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585242802000

Well Details

Well ID: 0585242802000
Loading map...
Location: 00/02-28-058-24W5/0
Location Alias: 00/02-28-58-24 W5M
Location Alias 2: 00/02-28-058-24 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 24
Section: 28
County/Municipality: Municipal District of Greenview No. 16
Well Name: CVE 100 HZ BERLRW 2-28-58-24
Operator Name: Cenovus Energy Inc.
License Number: 0485870
License Date: 2017-10-17
License Status: Issued
Spud Date: 2017-12-02
Final Drill Date: 2017-12-27
Well Total Depth: 5719.00 m
Surface Hole Latitude: 54.055936
Surface Hole Longitude: -117.528288

For data sources see[1][2]

Well History

Date Event
2017-10-17 Obtained License
2017-12-04 Surface Casing Operation Performed
2017-12-06 Well Log Performed
2017-12-10 Direction Drilling Operation Performed - Deviate
2017-12-14 Direction Drilling Operation Performed - Horizontal
2017-12-15 Well Log Performed
2017-12-16 Intermediate Casing Operation Performed
2017-12-17 Well Log Performed
2017-12-27 Finished Drilling
2017-12-27 Well Log Performed
2017-12-27 Well Mode changed to Drilled and Cased
2017-12-29 Well Log Performed
2017-12-30 Liner Casing Operation Performed
2017-12-30 Perforation Treatment Performed - Open-Hole Completion
2018-01-01 Rig Released
2018-01-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-20 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-21 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-22 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-27 Well Fluid changed to Gas
2018-01-27 Well Mode changed to Testing
2018-01-31 Well Began Production
2018-01-31 Well Fluid changed to Gas
2018-01-31 Well Mode changed to Flowing
2019-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-12-02 Precision Drilling Corporation 623 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-12-10 2557.80 Deviate (5 - 79 degrees)
2017-12-14 3231.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-12-30 Open Hole/Barefoot Completion 3323.00 5719.00 0
2018-01-20 Multi-Stage Fracture 5213.20 5213.70 0
2018-01-20 Multi-Stage Fracture 5152.60 5153.10 0
2018-01-20 Multi-Stage Fracture 5090.30 5090.80 0
2018-01-20 Multi-Stage Fracture 5043.00 5043.50 0
2018-01-20 Multi-Stage Fracture 4983.20 4983.70 0
2018-01-20 Multi-Stage Fracture 4921.20 4921.70 0
2018-01-20 Multi-Stage Fracture 4860.10 4860.60 0
2018-01-21 Multi-Stage Fracture 4798.00 4798.50 0
2018-01-21 Multi-Stage Fracture 4736.80 4737.30 0
2018-01-21 Multi-Stage Fracture 4676.10 4676.60 0
2018-01-19 Multi-Stage Fracture 5678.00 5678.50 0
2018-01-21 Multi-Stage Fracture 4628.10 4628.60 0
2018-01-22 Multi-Stage Fracture 4567.20 4567.70 0
2018-01-22 Multi-Stage Fracture 4507.40 4507.90 0
2018-01-22 Multi-Stage Fracture 4446.40 4446.90 0
2018-01-22 Multi-Stage Fracture 4386.90 4387.40 0
2018-01-22 Multi-Stage Fracture 4326.80 4327.30 0
2018-01-22 Multi-Stage Fracture 4265.90 4266.40 0
2018-01-22 Multi-Stage Fracture 4204.40 4204.90 0
2018-01-23 Multi-Stage Fracture 4142.10 4142.60 0
2018-01-23 Multi-Stage Fracture 4081.70 4082.20 0
2018-01-19 Multi-Stage Fracture 5628.80 5629.30 0
2018-01-23 Multi-Stage Fracture 4034.40 4034.90 0
2018-01-23 Multi-Stage Fracture 3974.50 3975.00 0
2018-01-24 Multi-Stage Fracture 3912.30 3912.80 0
2018-01-24 Multi-Stage Fracture 3850.00 3850.50 0
2018-01-24 Multi-Stage Fracture 3788.30 3788.80 0
2018-01-24 Multi-Stage Fracture 3727.50 3728.00 0
2018-01-24 Multi-Stage Fracture 3666.30 3666.80 0
2018-01-25 Multi-Stage Fracture 3618.50 3619.00 0
2018-01-25 Multi-Stage Fracture 3556.40 3556.90 0
2018-01-25 Multi-Stage Fracture 3496.60 3497.10 0
2018-01-19 Multi-Stage Fracture 5567.30 5567.80 0
2018-01-25 Multi-Stage Fracture 3436.10 3436.60 0
2018-01-25 Multi-Stage Fracture 3375.30 3375.80 0
2019-01-10 Acid Treatment 3323.00 5719.00 0
2020-03-25 Acid Treatment 3323.00 5719.00 0
2018-01-19 Multi-Stage Fracture 5506.20 5506.70 0
2018-01-19 Multi-Stage Fracture 5445.00 5445.50 0
2018-01-19 Multi-Stage Fracture 5397.80 5398.30 0
2018-01-19 Multi-Stage Fracture 5335.70 5336.20 0
2018-01-20 Multi-Stage Fracture 5273.70 5274.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-01-19 2018-01-25 2,974 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 79.1161 N/A
HVFR. N002 Schlumberger Quartz. Crystalline silica 14808-60-7 100 8.7603 N/A
HVFR. N002 Schlumberger Energizing Fluid Acrylamide/ammonium acrylate copolymer 26100-47-0 100 0.0281 N/A
2-Propenamid (impurity) 79-06-1 100 0 N/A
Alcohols. C12-14-secondary. ethoxylated 84133-50-6 100 0.0002 N/A
Aliphatic co-polymer Trade Secret 100 0.0002 N/A
Amines. dicoco alkylmethyl 61788-62-3 100 0 N/A
Ammonium chloride 12125-02-9 100 0.0012 N/A
Diammonium peroxodisulphate 7727-54-0 100 0.0009 N/A
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 100 0.0004 N/A
Distillates (petroleum). solvent-dewaxed heavy paraffinic 64742-65-0 100 0.0068 N/A
Distillates. petroleum. hydrotreated light 64742-47-8 100 0.0153 N/A
Ethoxylated oleic acid 9004-96-0 100 0.0021 N/A
Glutaraldehyde 111-30-8 100 0.0021 N/A
Methanol (impurity) 67-56-1 100 0 N/A
Nitrogen. liquid form 7727-37-9 100 3.2988 N/A
Phyllosilicate mineral Trade Secret 100 0 N/A
Polyethylene glycol monohexyl ether 31726-34-8 100 0.0048 N/A
Propan-2-ol 67-63-0 100 0 N/A
Sorbitan monooleate 1338-43-8 100 0.0025 N/A
Synthetic fluoropolymer Trade Secret 100 0 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-11-29 2017-12-07 Surface Water - River 17161
2017-11-18 2017-11-29 Surface Water - River 15002

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6907 0.0 0.0 0.0
2019 7731 0.0 0.0 0.0
2020 1859 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-05 No Incident Encountered 0.00 0.00
2018-02-11 No Incident Encountered 0.00 0.00
2019-01-10 No Incident Encountered 0.00 0.00
2020-03-26 No Incident Encountered 0.00 0.00

For data sources see[10]

References