X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585233516004

Well Details

Well ID: 0585233516004
Loading map...
Location: 00/16-35-058-23W5/4
Location Alias: 00/16-35-58-23 W5M
Location Alias 2: 00/16-35-058-23 W5/04
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 23
Section: 35
County/Municipality: Municipal District of Greenview No. 16
Well Name: MAPAN ENERGY BERLR 16-35-58-23
Operator Name: Tourmaline Oil Corp.
License Number: 0342798
License Date: 2005-11-16
License Status: Issued
Spud Date: 2005-12-29
Final Drill Date: 2006-01-10
Well Total Depth: 2738.00 m
Surface Hole Latitude: 54.061406
Surface Hole Longitude: -117.302130

For data sources see[1][2]

Well History

Date Event
2005-11-16 Obtained License
2005-12-31 Surface Casing Operation Performed
2006-01-10 Finished Drilling
2006-01-10 Well Log Performed
2006-01-10 Well Mode changed to Drilled and Cased
2006-01-12 Production Casing Operation Performed
2006-01-13 Rig Released
2006-01-24 Perforation Treatment Performed - Jet Perforation
2006-01-25 Perforation Treatment Performed - Fractured
2006-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-01-30 Perforation Treatment Performed - Jet Perforation
2006-01-30 Plug Back Performed
2006-01-31 Perforation Treatment Performed - Fractured
2006-02-01 Perforation Treatment Performed - Jet Perforation
2006-02-02 Perforation Treatment Performed - Fractured
2006-02-03 Perforation Treatment Performed - Jet Perforation
2006-02-04 Perforation Treatment Performed - Fractured
2006-02-04 Well Fluid changed to Gas
2006-02-04 Well Mode changed to Testing
2006-02-07 Well Fluid changed to Gas
2006-02-07 Well Mode changed to Test Completed
2006-04-13 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-01-24 Perforation 2686.50 2690.50 20
2006-02-04 Fracture 2166.00 2170.00 0
2006-01-25 Fracture 2686.50 2690.50 0
2006-01-30 Packing Device Capped w/Cement 2670.00 2678.00 0
2006-01-30 Perforation 2594.00 2595.00 4
2006-01-30 Perforation 2582.50 2583.50 4
2006-01-31 Fracture 2582.50 2595.00 0
2006-02-01 Perforation 2369.50 2373.50 20
2006-02-02 Fracture 2369.50 2373.50 0
2006-02-03 Perforation 2166.00 2170.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 43 0.0 0.0 0.0

For data sources see[5]

References