X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585233416000

Well Details

Well ID: 0585233416000
Loading map...
Location: 00/16-34-058-23W5/0
Location Alias: 00/16-34-58-23 W5M
Location Alias 2: 00/16-34-058-23 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 23
Section: 34
County/Municipality: Municipal District of Greenview No. 16
Well Name: MAPAN ENERGY BERLR 16-34-58-23
Operator Name: Tourmaline Oil Corp.
License Number: 0416774
License Date: 2010-01-05
License Status: Issued
Spud Date: 2010-02-18
Final Drill Date: 2010-02-25
Well Total Depth: 2803.00 m
Surface Hole Latitude: 54.063115
Surface Hole Longitude: -117.319824

For data sources see[1][2]

Well History

Date Event
2010-01-05 Obtained License
2010-02-10 Surface Casing Operation Performed
2010-02-18 Direction Drilling Operation Performed - Deviate
2010-02-25 Finished Drilling
2010-02-25 Well Mode changed to Drilled and Cased
2010-02-26 Well Log Performed
2010-02-27 Production Casing Operation Performed
2010-02-27 Rig Released
2010-02-28 Well Log Performed
2010-03-11 Well Log Performed
2010-03-13 Perforation Treatment Performed - Jet Perforation
2010-03-14 Perforation Treatment Performed - Fractured
2010-03-15 Perforation Treatment Performed - Jet Perforation
2010-03-16 Perforation Treatment Performed - Fractured
2011-01-06 Perforation Treatment Performed - Jet Perforation
2011-01-06 Well Log Performed
2011-01-10 Perforation Treatment Performed - Fractured
2011-01-10 Perforation Treatment Performed - Jet Perforation
2011-01-10 Well Log Performed
2011-01-11 Perforation Treatment Performed - Fractured
2011-01-11 Perforation Treatment Performed - Jet Perforation
2011-01-11 Well Log Performed
2011-01-12 Perforation Treatment Performed - Fractured
2011-01-12 Perforation Treatment Performed - Jet Perforation
2011-01-31 Well Began Production
2011-01-31 Well Fluid changed to Gas
2011-01-31 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-18 143.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-13 Perforation 2785.00 2785.60 10
2010-03-15 Perforation 2625.00 2625.30 10
2010-03-15 Perforation 2622.00 2622.30 10
2010-03-15 Perforation 2614.50 2614.80 10
2010-03-15 Perforation 2606.50 2607.10 10
2010-03-15 Perforation 2601.00 2601.60 10
2010-03-15 Perforation 2597.00 2597.30 10
2010-03-16 Fracture 2597.00 2630.10 0
2011-01-06 Perforation 2523.00 2523.60 10
2011-01-06 Perforation 2504.00 2504.60 10
2011-01-06 Perforation 2487.00 2487.90 10
2010-03-13 Perforation 2778.00 2778.30 10
2011-01-06 Perforation 2484.50 2485.40 10
2011-01-06 Perforation 2475.00 2475.90 10
2011-01-06 Perforation 2472.00 2472.90 10
2011-01-10 Fracture 2472.00 2523.60 0
2011-01-10 Perforation 2434.50 2435.10 10
2011-01-10 Perforation 2431.50 2432.10 10
2011-01-10 Perforation 2418.00 2419.20 10
2011-01-10 Perforation 2413.50 2414.40 10
2011-01-10 Perforation 2410.50 2411.40 10
2011-01-10 Perforation 2407.50 2408.10 10
2010-03-13 Perforation 2772.00 2772.60 10
2011-01-11 Fracture 2407.50 2435.10 0
2011-01-11 Perforation 2262.50 2263.10 10
2011-01-11 Perforation 2259.50 2260.40 10
2011-01-11 Perforation 2251.50 2251.80 10
2011-01-11 Perforation 2248.50 2249.40 10
2011-01-12 Perforation 1951.00 1951.90 10
2011-01-12 Perforation 1944.00 1944.60 10
2011-01-12 Perforation 1942.00 1942.60 10
2011-01-12 Perforation 1937.50 1938.70 10
2011-01-12 Perforation 1934.50 1935.40 10
2010-03-13 Perforation 2753.00 2753.30 10
2011-01-12 Perforation 1931.50 1931.80 10
2011-01-12 Fracture 1931.50 2263.10 0
2010-03-13 Perforation 2749.00 2749.30 10
2010-03-13 Perforation 2746.00 2746.30 10
2010-03-13 Perforation 2742.00 2742.60 10
2010-03-14 Fracture 2742.00 2785.60 0
2010-03-15 Perforation 2629.50 2630.10 10

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7421 0.0 0.0 0.0
2012 8367 0.0 0.0 0.0
2013 8195 0.0 0.0 0.0
2014 7806 0.0 0.0 0.0
2015 8402 0.0 0.0 0.0
2016 8023 0.0 0.0 0.0
2017 8477 0.0 0.0 0.0
2018 8687 0.0 0.0 0.0
2019 8255 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References