X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585222816022

Well Details

Well ID: 0585222816022
Loading map...
Location: 02/16-28-058-22W5/2
Location Alias: 02/16-28-58-22 W5M
Location Alias 2: 02/16-28-058-22 W5/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 22
Section: 28
County/Municipality: Municipal District of Greenview No. 16
Well Name: MAPAN ENERGY SUNDANCE 16-28-58-22
Operator Name: Tourmaline Oil Corp.
License Number: 0318773
License Date: 2004-11-12
License Status: Suspension
Spud Date: 2004-12-09
Final Drill Date: 2004-12-26
Well Total Depth: 2688.00 m
Surface Hole Latitude: 54.049198
Surface Hole Longitude: -117.202767

For data sources see[1][2]

Well History

Date Event
2004-11-12 Obtained License
2004-12-12 Surface Casing Operation Performed
2004-12-16 Direction Drilling Operation Performed - Deviate
2004-12-26 Finished Drilling
2004-12-26 Well Log Performed
2004-12-26 Well Mode changed to Drilled and Cased
2004-12-28 Production Casing Operation Performed
2004-12-29 Rig Released
2005-01-14 Perforation Treatment Performed - Jet Perforation
2005-01-16 Perforation Treatment Performed - Fractured
2005-06-11 Perforation Treatment Performed - Jet Perforation
2005-06-16 Perforation Treatment Performed - Fractured
2005-06-16 Well Fluid changed to Gas
2005-06-16 Well Mode changed to Testing
2005-06-20 Well Fluid changed to Gas
2005-06-20 Well Mode changed to Test Completed
2005-06-23 Perforation Treatment Performed - Jet Perforation
2005-06-24 Perforation Treatment Performed - Remedial Casing
2005-08-10 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-12-16 1605.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-01-14 Perforation 2644.00 2650.00 17
2005-01-16 Fracture 2644.00 2650.00 0
2005-06-11 Perforation 2627.00 2632.50 17
2005-06-16 Fracture 2627.00 2632.50 0
2005-06-23 Perforation 823.00 824.00 14
2005-06-24 Remedial Casing Cementing 823.00 824.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 56 0.0 0.0 0.0

For data sources see[6]

References