X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585221809004

Well Details

Well ID: 0585221809004
Loading map...
Location: 00/09-18-058-22W5/4
Location Alias: 00/09-18-58-22 W5M
Location Alias 2: 00/09-18-058-22 W5/04
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 22
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACL CECILIA 9-18-58-22
Operator Name: Paramount Resources Ltd.
License Number: 0361192
License Date: 2006-08-03
License Status: Issued
Spud Date: 2006-09-29
Final Drill Date: 2006-10-09
Well Total Depth: 2744.00 m
Surface Hole Latitude: 54.017465
Surface Hole Longitude: -117.252481

For data sources see[1][2]

Well History

Date Event
2006-08-03 Obtained License
2006-10-01 Surface Casing Operation Performed
2006-10-09 Finished Drilling
2006-10-09 Well Log Performed
2006-10-09 Well Mode changed to Drilled and Cased
2006-10-10 Well Log Performed
2006-10-11 Production Casing Operation Performed
2006-10-12 Rig Released
2006-10-15 Well Log Performed
2006-10-16 Perforation Treatment Performed - Jet Perforation
2006-10-17 Perforation Treatment Performed - Fractured
2006-10-20 Perforation Treatment Performed - Jet Perforation
2006-10-21 Well Log Performed
2006-10-22 Perforation Treatment Performed - Jet Perforation
2006-10-23 Perforation Treatment Performed - Fractured
2006-10-25 Well Log Performed
2006-10-26 Perforation Treatment Performed - Jet Perforation
2006-10-27 Perforation Treatment Performed - Fractured
2006-10-28 Well Log Performed
2006-10-29 Perforation Treatment Performed - Jet Perforation
2006-10-30 Perforation Treatment Performed - Fractured
2006-10-31 Well Log Performed
2007-03-28 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-10-16 Perforation 2703.90 2721.90 2
2006-10-23 Fracture 2486.80 2566.80 0
2006-10-26 Perforation 2354.00 2359.40 2
2006-10-26 Perforation 2368.20 2369.90 2
2006-10-26 Perforation 2372.30 2372.40 2
2006-10-27 Fracture 2354.00 2372.40 0
2006-10-29 Perforation 2207.00 2209.50 20
2006-10-30 Fracture 2207.00 2209.50 0
2006-10-16 Perforation 2722.60 2723.90 2
2006-10-16 Perforation 2725.40 2725.50 2
2006-10-17 Fracture 2703.90 2725.50 0
2006-10-20 Perforation 2560.80 2560.90 8
2006-10-20 Perforation 2564.10 2564.20 4
2006-10-20 Perforation 2566.70 2566.80 2
2006-10-22 Perforation 2486.80 2486.90 2
2006-10-22 Perforation 2494.90 2495.00 2

For data sources see[4]



References