X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585220716003

Well Details

Well ID: 0585220716003
Loading map...
Location: 00/16-07-058-22W5/3
Location Alias: 00/16-07-58-22 W5M
Location Alias 2: 00/16-07-058-22 W5/03
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 22
Section: 07
County/Municipality: Municipal District of Greenview No. 16
Well Name: MAPAN ENERGY SUNDANCE 16-7-58-22
Operator Name: Tourmaline Oil Corp.
License Number: 0361516
License Date: 2006-08-11
License Status: Issued
Spud Date: 2006-08-25
Final Drill Date: 2006-09-07
Well Total Depth: 2796.00 m
Surface Hole Latitude: 54.003208
Surface Hole Longitude: -117.253007

For data sources see[1][2]

Well History

Date Event
2006-08-11 Obtained License
2006-08-28 Surface Casing Operation Performed
2006-09-07 Finished Drilling
2006-09-07 Well Mode changed to Drilled and Cased
2006-09-08 Well Log Performed
2006-09-09 Production Casing Operation Performed
2006-09-10 Rig Released
2006-10-06 Perforation Treatment Performed - Jet Perforation
2006-10-07 Perforation Treatment Performed - Fractured
2006-10-12 Perforation Treatment Performed - Jet Perforation
2006-10-14 Perforation Treatment Performed - Fractured
2006-10-22 Perforation Treatment Performed - Jet Perforation
2006-10-23 Perforation Treatment Performed - Fractured
2006-10-25 Perforation Treatment Performed - Jet Perforation
2006-10-26 Perforation Treatment Performed - Fractured
2006-10-26 Well Fluid changed to Gas
2006-10-26 Well Mode changed to Testing
2006-10-27 Well Fluid changed to Gas
2006-10-27 Well Mode changed to Test Completed
2006-10-28 Perforation Treatment Performed - Jet Perforation
2006-10-30 Perforation Treatment Performed - Fractured
2006-11-02 Perforation Treatment Performed - Jet Perforation
2006-11-03 Perforation Treatment Performed - Fractured
2006-11-05 Perforation Treatment Performed - Jet Perforation
2006-11-06 Perforation Treatment Performed - Fractured
2006-12-20 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-10-06 Perforation 2744.50 2746.00 17
2006-10-25 Perforation 2486.50 2487.50 4
2006-10-26 Fracture 2486.50 2591.50 0
2006-10-28 Perforation 2368.00 2369.50 17
2006-10-30 Fracture 2368.00 2369.50 0
2006-11-02 Perforation 2243.50 2247.50 17
2006-11-03 Fracture 2243.50 2247.50 0
2006-11-05 Perforation 1914.50 1916.50 17
2006-11-06 Fracture 1914.50 1916.50 0
2006-10-07 Fracture 2744.50 2746.00 0
2006-10-12 Perforation 2745.00 2750.00 17
2006-10-14 Fracture 2745.00 2750.00 0
2006-10-22 Perforation 2721.50 2725.50 17
2006-10-23 Fracture 2721.50 2725.50 0
2006-10-25 Perforation 2590.50 2591.50 3
2006-10-25 Perforation 2560.50 2561.50 3
2006-10-25 Perforation 2527.00 2528.00 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 32 0.0 0.0 0.0

For data sources see[5]

References