If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0585213516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.036103,"lon":-116.999971,"icon":""}]} |
Location: 00/16-35-058-21W5/0 | |
Location Alias: 00/16-35-58-21 W5M | |
Location Alias 2: 00/16-35-058-21 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 5 | |
Range: 21 | |
Section: 35 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TRILOGY HZ FIR 16-35-58-21 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0442663 | |
License Date: 2012-01-11 | |
License Status: Issued | |
Spud Date: 2012-01-19 | |
Final Drill Date: 2012-03-06 | |
Well Total Depth: 5489.00 m | |
Surface Hole Latitude: 54.036103 | |
Surface Hole Longitude: -116.999971 |
Date | Event |
---|---|
2012-01-11 | Obtained License |
2012-01-26 | Surface Casing Operation Performed |
2012-02-09 | Direction Drilling Operation Performed - Horizontal |
2012-02-14 | Intermediate Casing Operation Performed |
2012-03-06 | Finished Drilling |
2012-03-06 | Well Log Performed |
2012-03-06 | Well Mode changed to Drilled and Cased |
2012-03-10 | Liner Casing Operation Performed |
2012-03-10 | Rig Released |
2012-03-18 | Well Log Performed |
2012-03-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-22 | Perforation Treatment Performed - Open-Hole Completion |
2012-03-27 | Well Began Production |
2012-03-27 | Well Fluid changed to Gas |
2012-03-27 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-19 | Precision Drilling Corporation | 220 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-09 | 2671.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-22 | Open Hole/Barefoot Completion | 5469.00 | 5489.00 | 0 |
2012-03-22 | Multi-Stage Fracture | 4700.10 | 4801.00 | 0 |
2012-03-22 | Multi-Stage Fracture | 4613.20 | 4700.00 | 0 |
2012-03-22 | Multi-Stage Fracture | 4514.70 | 4613.10 | 0 |
2012-03-22 | Multi-Stage Fracture | 4411.30 | 4514.60 | 0 |
2012-03-22 | Multi-Stage Fracture | 4310.20 | 4411.20 | 0 |
2012-03-22 | Multi-Stage Fracture | 4212.30 | 4310.10 | 0 |
2012-03-22 | Multi-Stage Fracture | 4111.10 | 4212.20 | 0 |
2012-03-22 | Multi-Stage Fracture | 4007.10 | 4111.00 | 0 |
2012-03-22 | Multi-Stage Fracture | 3919.60 | 4007.00 | 0 |
2012-03-22 | Multi-Stage Fracture | 3820.00 | 3919.50 | 0 |
2012-03-22 | Multi-Stage Fracture | 5469.00 | 5489.00 | 0 |
2012-03-22 | Multi-Stage Fracture | 3710.40 | 3819.90 | 0 |
2012-03-22 | Multi-Stage Fracture | 3610.80 | 3710.30 | 0 |
2012-03-22 | Multi-Stage Fracture | 3521.10 | 3610.70 | 0 |
2012-03-22 | Multi-Stage Fracture | 3418.60 | 3521.00 | 0 |
2012-03-22 | Multi-Stage Fracture | 3316.20 | 3418.50 | 0 |
2012-03-22 | Multi-Stage Fracture | 3214.70 | 3316.10 | 0 |
2012-03-22 | Multi-Stage Fracture | 3125.70 | 3214.60 | 0 |
2012-03-22 | Multi-Stage Fracture | 3016.40 | 3125.60 | 0 |
2012-03-22 | Multi-Stage Fracture | 2929.50 | 3016.30 | 0 |
2012-03-22 | Multi-Stage Fracture | 2854.20 | 2929.40 | 0 |
2012-03-22 | Multi-Stage Fracture | 5403.60 | 5468.90 | 0 |
2012-03-22 | Multi-Stage Fracture | 5305.00 | 5403.50 | 0 |
2012-03-22 | Multi-Stage Fracture | 5206.90 | 5304.90 | 0 |
2012-03-22 | Multi-Stage Fracture | 5108.60 | 5206.80 | 0 |
2012-03-22 | Multi-Stage Fracture | 5010.00 | 5108.50 | 0 |
2012-03-22 | Multi-Stage Fracture | 4899.70 | 5009.90 | 0 |
2012-03-22 | Multi-Stage Fracture | 4801.10 | 4899.60 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6480 | 0.0 | 0.0 | 0.0 |
2013 | 7272 | 0.0 | 0.0 | 0.0 |
2014 | 6959 | 0.0 | 0.0 | 0.0 |
2015 | 8111 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 5639 | 0.0 | 0.0 | 0.0 |
2018 | 8183 | 0.0 | 0.0 | 0.0 |
2019 | 4639 | 0.0 | 0.0 | 0.0 |
2020 | 1943 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]