X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585212910002

Well Details

Well ID: 0585212910002
Loading map...
Location: 00/10-29-058-21W5/2
Location Alias: 00/10-29-58-21 W5M
Location Alias 2: 00/10-29-058-21 W5/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 21
Section: 29
County/Municipality: Municipal District of Greenview No. 16
Well Name: TALISMAN FIR 10-29-58-21
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0041568
License Date: 1971-12-09
License Status: Issued
Spud Date: 1971-12-12
Final Drill Date: 1972-01-06
Well Total Depth: 2811.20 m
Surface Hole Latitude: 54.046057
Surface Hole Longitude: -117.080466

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-12-09 Obtained License
1972-01-06 Finished Drilling
1972-01-06 Well Mode changed to Drilled and Cased
1972-01-09 Drill Stem Test Performed
1972-01-11 Drill Stem Test Performed
1972-01-12 Drill Stem Test Performed
1972-01-18 Production Casing Operation Performed
1972-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-01-29 Perforation Treatment Performed - Jet Perforation
1988-07-08 Perforation Treatment Performed - Jet Perforation
1988-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-08-18 Perforation Treatment Performed - Chemical Squeeze
2004-08-27 Perforation Treatment Performed - Cement Squeeze
2004-08-27 Plug Back Performed
2004-09-04 Perforation Treatment Performed - Jet Perforation
2004-09-16 Perforation Treatment Performed - Remedial Casing
2004-09-21 Well Log Performed
2004-09-22 Perforation Treatment Performed - Jet Perforation
2004-09-26 Perforation Treatment Performed - Fractured
2004-11-11 Well Began Production
2004-11-11 Well Fluid changed to Gas
2004-11-11 Well Mode changed to Flowing
2011-06-01 Well Fluid changed to Gas
2011-06-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-01-29 Perforation 2715.20 2720.00 7
2004-09-22 Perforation 2655.00 2659.00 17
2004-09-26 Fracture 2655.00 2659.00 0
1972-01-29 Acid Treatment 2715.20 2720.00 0
1988-07-08 Perforation 2714.50 2720.00 26
1988-07-20 Acid Treatment 2714.50 2720.00 0
2003-08-17 Acid Treatment 2714.50 2720.00 0
2003-08-18 Chemical Squeeze 2714.50 2720.00 0
2004-08-27 Cement Squeeze 2714.50 2720.00 0
2004-09-04 Perforation 2681.00 2687.00 13
2004-09-16 Remedial Casing Cementing 2681.00 2687.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 1220 0.0 0.0 0.0
2005 8712 0.0 0.0 0.0
2006 4631 0.0 0.0 0.0
2007 8616 0.0 0.0 0.0
2008 8663 0.0 0.0 0.0
2009 8591 0.0 0.0 0.0
2010 8495 0.0 0.0 0.0
2011 8520 0.0 0.0 0.0
2012 8602 0.0 0.0 0.0
2013 8615 0.0 0.0 0.0
2014 8279 0.0 0.0 0.0
2015 8447 0.0 0.0 0.0
2016 8519 0.0 0.0 0.0
2017 8543 0.0 0.0 0.0
2018 8179 0.0 0.0 0.0
2019 8449 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[5]

References