X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585203016003

Well Details

Well ID: 0585203016003
Loading map...
Location: 00/16-30-058-20W5/3
Location Alias: 00/16-30-58-20 W5M
Location Alias 2: 00/16-30-058-20 W5/03
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 20
Section: 30
County/Municipality: Municipal District of Greenview No. 16
Well Name: DAYLIGHT FIR 16-30-58-20
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0258611
License Date: 2001-08-16
License Status: Abandoned
Spud Date: 2001-09-04
Final Drill Date: 2001-09-16
Well Total Depth: 3558.00 m
Surface Hole Latitude: 54.045468
Surface Hole Longitude: -116.955193

For data sources see[1][2]

Well History

Date Event
2001-08-16 Obtained License
2001-09-04 Direction Drilling Operation Performed - Horizontal
2001-09-08 Well Log Performed
2001-09-10 Well Log Performed
2001-09-11 Liner Casing Operation Performed
2001-09-11 Well Log Performed
2001-09-16 Finished Drilling
2001-09-16 Plug Back Performed
2001-09-16 Well Log Performed
2001-09-17 Well Log Performed
2001-09-18 Perforation Treatment Performed - Open-Hole Completion
2001-09-18 Rig Released
2001-09-18 Well Mode changed to Drilled and Cased
2001-10-17 Well Log Performed
2001-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-02 Well Began Production
2001-12-02 Well Fluid changed to Gas
2001-12-02 Well Mode changed to Flowing
2002-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-05-31 Plug Back Performed
2003-05-31 Well Fluid changed to Gas
2003-05-31 Well Mode changed to Abandoned Zone
2003-06-03 Perforation Treatment Performed - Jet Perforation
2003-06-06 Perforation Treatment Performed - Fractured
2003-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-10 Plug Back Performed
2003-06-10 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-09-04 3076.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-09-18 Open Hole/Barefoot Completion 3421.00 3558.00 0
2001-10-23 Acid Treatment 3421.00 3558.00 0
2002-09-02 Acid Treatment 3421.00 3558.00 0
2003-05-31 Packing Device Capped w/Cement 3363.00 3371.00 0
2003-06-03 Perforation 1809.00 1813.50 14
2003-06-06 Fracture 1809.00 1813.50 0
2003-06-10 Packing Device Capped w/Cement 1797.00 1805.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 702 0.0 0.0 0.0
2002 6072 0.0 0.0 0.0
2003 127 0.0 0.0 0.0

For data sources see[6]

References