X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585201808003

Well Details

Well ID: 0585201808003
Loading map...
Location: 00/08-18-058-20W5/3
Location Alias: 00/08-18-58-20 W5M
Location Alias 2: 00/08-18-058-20 W5/03
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 20
Section: 18
County/Municipality: Yellowhead County
Well Name: DAYLIGHT ET AL PINE 7-18-58-20
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0079839
License Date: 1979-12-12
License Status: Abandoned
Spud Date: 2000-07-13
Final Drill Date: 2000-08-22
Well Total Depth: 3487.00 m
Surface Hole Latitude: 54.012570
Surface Hole Longitude: -116.956257

For data sources see[1][2]

Well History

Date Event
1979-12-12 Obtained License
2000-07-20 Direction Drilling Operation Performed - Horizontal
2000-07-22 Well Log Performed
2000-08-11 Liner Casing Operation Performed
2000-08-11 Well Log Performed
2000-08-19 Perforation Treatment Performed - Open-Hole Completion
2000-08-22 Finished Drilling
2000-08-23 Rig Released
2000-08-23 Well Log Performed
2000-08-23 Well Mode changed to Drilled and Cased
2000-12-18 Well Began Production
2000-12-18 Well Fluid changed to Gas
2000-12-18 Well Mode changed to Flowing
2001-04-30 Well Log Performed
2001-05-02 Well Log Performed
2002-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-26 Plug Back Performed
2002-07-26 Well Fluid changed to Gas
2002-07-26 Well Log Performed
2002-07-26 Well Mode changed to Abandoned Zone
2002-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-07-29 Perforation Treatment Performed - Jet Perforation
2011-11-24 Well Log Performed
2011-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-30 Perforation Treatment Performed - Cement Squeeze
2011-11-30 Plug Back Performed
2011-12-02 Perforation Treatment Performed - Jet Perforation
2011-12-02 Perforation Treatment Performed - Remedial Casing
2011-12-02 Well Log Performed
2011-12-08 Perforation Treatment Performed - Jet Perforation
2011-12-08 Well Log Performed
2011-12-13 Perforation Treatment Performed - Remedial Casing
2011-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-15 Well Log Performed
2011-12-16 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-07-20 2295.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-08-19 Open Hole/Barefoot Completion 3172.50 3487.00 0
2011-12-13 Remedial Casing Cementing 482.00 487.00 0
2011-12-15 Packing Device Capped w/Cement 466.00 474.00 0
2002-07-26 Packing Device Capped w/Cement 2982.00 2990.00 0
2002-07-29 Perforation 2952.50 2956.50 20
2002-07-29 Acid Treatment 2952.50 2956.50 0
2011-11-30 Cement Squeeze 2952.50 2956.50 0
2011-11-30 Packing Device Capped w/Cement 2800.00 2938.00 0
2011-12-02 Perforation 505.00 506.00 17
2011-12-02 Remedial Casing Cementing 505.00 506.00 0
2011-12-08 Perforation 482.00 487.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 289 0.0 0.0 0.0
2001 6430 0.0 0.0 0.0
2002 2659 0.0 0.0 0.0

For data sources see[6]

References