X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585191710000

Well Details

Well ID: 0585191710000
Loading map...
Location: 00/10-17-058-19W5/0
Location Alias: 00/10-17-58-19 W5M
Location Alias 2: 00/10-17-058-19 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 19
Section: 17
County/Municipality: Yellowhead County
Well Name: ACL KAYBOBS 10-17-58-19
Operator Name: Paramount Resources Ltd.
License Number: 0027571
License Date: 1965-01-19
License Status: Suspension
Spud Date: 1965-01-26
Final Drill Date: 1965-03-13
Well Total Depth: 3151.00 m
Surface Hole Latitude: 54.015872
Surface Hole Longitude: -116.784850

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-01-19 Obtained License
1965-03-03 Drill Stem Test Performed
1965-03-04 Drill Stem Test Performed
1965-03-13 Finished Drilling
1965-03-13 Well Mode changed to Drilled and Cased
1965-03-15 Production Casing Operation Performed
1965-03-17 Blowout Occurred
1965-03-17 Perforation Treatment Performed - Open-Hole Completion
1965-09-01 Well Began Production
1965-09-01 Well Fluid changed to Gas
1965-09-01 Well Mode changed to Flowing
1970-01-08 Well Fluid changed to Gas
1970-01-08 Well Mode changed to Suspended
1971-12-20 Well Fluid changed to Gas
1971-12-20 Well Mode changed to Flowing
1975-11-28 Well Fluid changed to Gas
1975-11-28 Well Mode changed to Suspended
1987-02-26 Well Log Performed
1987-08-31 Well Log Performed
1987-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-09-01 Perforation Treatment Performed - Cement Squeeze
1987-09-02 Well Log Performed
1987-09-05 Perforation Treatment Performed - Jet Perforation
1987-09-05 Well Log Performed
1987-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-01 Well Fluid changed to Gas
1990-10-01 Well Mode changed to Flowing
1990-10-30 Well Log Performed
1990-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-11-01 Well Fluid changed to Gas
1990-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-03-17 Open Hole/Barefoot Completion 3147.70 3151.00 0
1987-09-01 Acid Treatment 3147.70 3151.00 0
1987-09-01 Cement Squeeze 3147.70 3151.00 0
1987-09-05 Perforation 3136.40 3139.40 13
1987-09-06 Acid Treatment 3136.40 3139.40 0
1990-10-31 Packing Device Capped w/Cement 3092.00 3100.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1061 0.0 0.0 0.0
1969 1329 0.0 0.0 0.0
1972 1198 0.0 0.0 0.0
1973 65 0.0 0.0 0.0
1990 48 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1965-03-17 Blowout 3147.20 3447.20

For data sources see[6]

References