X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585191002003

Well Details

Well ID: 0585191002003
Loading map...
Location: 00/02-10-058-19W5/3
Location Alias: 00/02-10-58-19 W5M
Location Alias 2: 00/02-10-058-19 W5/03
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 19
Section: 10
County/Municipality: Yellowhead County
Well Name: ACL PINE CK 2-10-58-19
Operator Name: Paramount Resources Ltd.
License Number: 0012120
License Date: 1956-08-20
License Status: Abandoned
Spud Date: 1956-08-30
Final Drill Date: 1957-02-15
Well Total Depth: 3524.10 m
Surface Hole Latitude: 53.993493
Surface Hole Longitude: -116.735110

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-08-20 Obtained License
1956-08-30 Lost Circulation Occurred
1956-10-01 Drill Stem Test Performed
1956-10-04 Drill Stem Test Performed
1956-10-08 Drill Stem Test Performed
1956-10-13 Drill Stem Test Performed
1956-11-08 Drill Stem Test Performed
1956-11-28 Drill Stem Test Performed
1956-12-04 Drill Stem Test Performed
1957-01-15 Drill Stem Test Performed
1957-01-26 Drill Stem Test Performed
1957-02-06 Drill Stem Test Performed
1957-02-09 Drill Stem Test Performed
1957-02-12 Drill Stem Test Performed
1957-02-15 Drill Stem Test Performed
1957-02-15 Finished Drilling
1957-02-15 Well Mode changed to Drilled and Cased
1957-02-17 Production Casing Operation Performed
1957-02-21 Perforation Treatment Performed - Bullet Perforation
1959-02-03 Drill Stem Test Performed
1959-02-05 Drill Stem Test Performed
1961-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-03-31 Perforation Treatment Performed - Jet Perforation
1980-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-04-01 Plug Back Performed
1985-04-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-04-02 Plug Back Performed
1985-04-02 Well Log Performed
1985-04-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-04-05 Plug Back Performed
1985-04-05 Well Log Performed
1985-04-06 Perforation Treatment Performed - Jet Perforation
1985-04-07 Perforation Treatment Performed - Fractured
1985-04-07 Well Log Performed
1985-04-08 Well Log Performed
1985-04-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-04-10 Plug Back Performed
1985-04-10 Well Log Performed
1985-04-11 Perforation Treatment Performed - Fractured
1985-04-11 Perforation Treatment Performed - Jet Perforation
1985-04-12 Well Log Performed
1985-05-01 Well Began Production
1985-05-01 Well Fluid changed to Crude Oil
1985-05-01 Well Mode changed to Pumping
1988-12-01 Well Fluid changed to Crude Oil
1988-12-01 Well Mode changed to Suspended
2009-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-07-25 Plug Back Performed
2009-07-25 Well Fluid changed to Crude Oil
2009-07-25 Well Mode changed to Abandoned Zone
2009-07-26 Perforation Treatment Performed - Jet Perforation
2009-07-27 Perforation Treatment Performed - Cement Plug
2009-07-27 Plug Back Performed
2009-07-29 Perforation Treatment Performed - Jet Perforation
2009-07-29 Perforation Treatment Performed - Remedial Casing
2009-07-30 Perforation Treatment Performed - Cement Plug
2009-12-11 Well Abandoned
2009-12-11 Well Fluid changed to Crude Oil
2009-12-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-02-21 Bullet Perforation 3473.20 3477.20 13
1980-03-31 Perforation 2684.00 2688.30 7
1980-04-04 Acid Treatment 2684.00 2688.30 0
1985-04-01 Packing Device Capped w/Cement 2637.00 2645.00 0
1985-04-02 Packing Device Capped w/Cement 1692.00 1700.00 0
1985-04-05 Packing Device Capped w/Cement 1663.00 1671.00 0
1985-04-06 Perforation 1607.50 1611.50 13
1985-04-07 Fracture 1607.50 1611.50 0
1985-04-10 Packing Device Capped w/Cement 1592.00 1600.00 0
1985-04-11 Perforation 1482.00 1484.40 13
1985-04-11 Fracture 1482.00 1484.40 0
1957-02-21 Bullet Perforation 3482.00 3485.70 13
2009-07-25 Packing Device Capped w/Cement 1467.00 1475.00 0
2009-07-26 Perforation 603.00 603.60 99
2009-07-27 Cement Plug 584.60 630.00 0
2009-07-29 Perforation 490.00 490.60 99
2009-07-29 Remedial Casing Cementing 490.00 490.60 0
2009-07-30 Cement Plug 473.30 485.00 0
1957-02-21 Bullet Perforation 3471.40 3473.20 13
1957-02-21 Bullet Perforation 3468.90 3470.80 13
1957-02-21 Bullet Perforation 3464.40 3466.20 13
1957-02-21 Bullet Perforation 3458.30 3460.10 13
1957-02-21 Bullet Perforation 3456.40 3458.30 13
1961-01-10 Acid Treatment 3456.40 3485.70 0
1980-03-27 Packing Device Capped w/Cement 3364.00 3372.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 4795 0.0 0.0 0.0
1986 3038 0.0 0.0 0.0
1987 794 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1956-08-30 Lost Circulation 31.40 31.40

For data sources see[6]

References