X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585190216000

Well Details

Well ID: 0585190216000
Loading map...
Location: 00/16-02-058-19W5/0
Location Alias: 00/16-02-58-19 W5M
Location Alias 2: 00/16-02-058-19 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 19
Section: 02
County/Municipality: Yellowhead County
Well Name: DAYLIGHT PINE 16-2-58-19
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0243942
License Date: 2000-11-03
License Status: Suspension
Spud Date: 2000-11-11
Final Drill Date: 2000-12-31
Well Total Depth: 3585.00 m
Surface Hole Latitude: 53.990958
Surface Hole Longitude: -116.706655

For data sources see[1][2]

Well History

Date Event
2000-11-03 Obtained License
2000-11-14 Surface Casing Operation Performed
2000-12-18 Well Log Performed
2000-12-21 Intermediate Casing Operation Performed
2000-12-31 Finished Drilling
2000-12-31 Lost Circulation Occurred
2000-12-31 Well Log Performed
2001-01-02 Liner Casing Operation Performed
2001-01-03 Rig Released
2001-01-03 Well Mode changed to Drilled and Cased
2001-02-03 Well Log Performed
2001-02-04 Perforation Treatment Performed - Jet Perforation
2001-02-04 Well Log Performed
2001-02-06 Perforation Treatment Performed - Jet Perforation
2001-02-06 Well Log Performed
2001-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-02-10 Perforation Treatment Performed - Jet Perforation
2001-02-10 Well Log Performed
2001-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-15 Plug Back Performed
2001-02-15 Well Log Performed
2001-02-15 Well Mode changed to Abandoned Zone
2001-02-17 Perforation Treatment Performed - Jet Perforation
2001-02-17 Well Log Performed
2001-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-02-22 Perforation Treatment Performed - Fractured
2012-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-29 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-02-04 Perforation 3557.00 3559.00 13
2012-08-29 Packing Device Capped w/Cement 2640.00 2648.00 0
2001-02-06 Perforation 3548.00 3552.00 13
2001-02-08 Acid Treatment 3548.00 3552.00 0
2001-02-10 Perforation 3529.00 3534.00 13
2001-02-12 Acid Treatment 3529.00 3534.00 0
2001-02-15 Packing Device Capped w/Cement 3517.00 3525.00 0
2001-02-17 Perforation 2665.00 2672.00 13
2001-02-18 Acid Treatment 2665.00 2672.00 0
2001-02-22 Fracture 2665.00 2672.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2000-12-31 Lost Circulation 3560.00 3585.00
2012-08-30 No Incident Encountered 0.00 0.00

For data sources see[5]

References