X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585183505000

Well Details

Well ID: 0585183505000
Loading map...
Location: 00/05-35-058-18W5/0
Location Alias: 00/05-35-58-18 W5M
Location Alias 2: 00/05-35-058-18 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 18
Section: 35
County/Municipality: Yellowhead County
Well Name: TRILOGY BLGV 3 KAYBOBS 5-35-58-18
Operator Name: Paramount Resources Ltd.
License Number: 0038938
License Date: 1970-10-06
License Status: Suspension
Spud Date: 1970-10-25
Final Drill Date: 1970-11-27
Well Total Depth: 3493.30 m
Surface Hole Latitude: 54.056975
Surface Hole Longitude: -116.576713

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-10-06 Obtained License
1970-11-27 Finished Drilling
1970-11-27 Well Mode changed to Drilled and Cased
1970-11-30 Production Casing Operation Performed
1971-03-24 Perforation Treatment Performed - Jet Perforation
1971-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-03-19 Well Began Production
1972-03-19 Well Fluid changed to Gas
1972-03-19 Well Mode changed to Flowing
1981-06-20 Perforation Treatment Performed - Cement Squeeze
1981-06-25 Perforation Treatment Performed - Jet Perforation
2004-10-14 Well Log Performed
2004-10-15 Well Log Performed
2012-07-23 Well Log Performed
2012-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-22 Plug Back Performed
2012-08-22 Well Fluid changed to Gas
2012-08-22 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-03-24 Perforation 3355.20 3367.10 7
1971-03-24 Perforation 3371.10 3385.10 7
1971-03-28 Acid Treatment 3355.20 3385.10 0
1971-03-29 Acid Treatment 3355.20 3385.10 0
1981-06-20 Cement Squeeze 3355.20 3385.10 0
1981-06-25 Perforation 3349.70 3352.10 7
2012-08-22 Packing Device Capped w/Cement 3275.70 3341.00 0
2012-08-22 Packing Device Capped w/Cement 2909.60 3275.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 72 0.0 0.0 0.0
1972 5224 0.0 0.0 0.0
1973 7927 0.0 0.0 0.0
1974 8547 0.0 0.0 0.0
1975 4415 0.0 0.0 0.0
1981 4239 0.0 0.0 0.0
1982 8409 0.0 0.0 0.0
1983 8631 0.0 0.0 0.0
1984 8591 0.0 0.0 0.0
1985 8403 0.0 0.0 0.0
1986 8661 0.0 0.0 0.0
1987 8674 0.0 0.0 0.0
1988 8321 0.0 0.0 0.0
1989 8742 0.0 0.0 0.0
1990 8640 0.0 0.0 0.0
1991 8156 0.0 0.0 0.0
1992 8652 0.0 0.0 0.0
1993 8713 0.0 0.0 0.0
1994 8342 0.0 0.0 0.0
1995 8635 0.0 0.0 0.0
1996 7500 0.0 0.0 0.0
1997 8394 0.0 0.0 0.0
1998 8587 0.0 0.0 0.0
1999 8652 0.0 0.0 0.0
2000 7938 0.0 0.0 0.0
2001 8146 0.0 0.0 0.0
2002 5790 0.0 0.0 0.0
2004 1097 0.0 0.0 0.0
2005 7968 0.0 0.0 0.0
2006 4696 0.0 0.0 0.0
2007 7517 0.0 0.0 0.0
2008 8005 0.0 0.0 0.0
2009 4256 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2004-10-16 No Incident Encountered 0.00 0.00
1981-06-20 No Incident Encountered 0.00 0.00
2012-08-25 No Incident Encountered 0.00 0.00
2012-11-02 No Incident Encountered 0.00 0.00

For data sources see[6]

References