X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585183105000

Well Details

Well ID: 0585183105000
Loading map...
Location: 00/05-31-058-18W5/0
Location Alias: 00/05-31-58-18 W5M
Location Alias 2: 00/05-31-058-18 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 18
Section: 31
County/Municipality: Yellowhead County
Well Name: DAYLIGHT HZ KAYBOBS 5-31-58-18
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0434503
License Date: 2011-06-21
License Status: Issued
Spud Date: 2011-07-22
Final Drill Date: 2011-08-11
Well Total Depth: 3670.00 m
Surface Hole Latitude: 54.052162
Surface Hole Longitude: -116.655278

For data sources see[1][2]

Well History

Date Event
2011-06-21 Obtained License
2011-07-24 Surface Casing Operation Performed
2011-07-28 Direction Drilling Operation Performed - Horizontal
2011-07-31 Well Log Performed
2011-08-01 Intermediate Casing Operation Performed
2011-08-11 Finished Drilling
2011-08-11 Well Mode changed to Drilled and Cased
2011-08-13 Liner Casing Operation Performed
2011-08-14 Well Log Performed
2011-08-15 Rig Released
2011-08-26 Well Log Performed
2011-09-06 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-06 Perforation Treatment Performed - Open-Hole Completion
2011-09-07 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-23 Well Began Production
2011-11-23 Well Fluid changed to Gas
2011-11-23 Well Mode changed to Flowing
2012-02-03 Well Log Performed
2016-06-01 Well Fluid changed to Gas
2016-06-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-28 1920.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-06 Open Hole/Barefoot Completion 3665.00 3670.00 0
2011-09-07 Multi-Stage Fracture 2886.60 2886.70 0
2011-09-07 Multi-Stage Fracture 2797.10 2797.20 0
2011-09-07 Multi-Stage Fracture 2708.20 2708.30 0
2011-09-07 Multi-Stage Fracture 2611.00 2611.10 0
2011-09-07 Multi-Stage Fracture 2524.20 2524.30 0
2011-09-06 Multi-Stage Fracture 3619.10 3619.20 0
2011-09-06 Multi-Stage Fracture 3523.80 3523.90 0
2011-09-06 Multi-Stage Fracture 3434.70 3434.80 0
2011-09-06 Multi-Stage Fracture 3345.30 3345.40 0
2011-09-07 Multi-Stage Fracture 3255.00 3255.10 0
2011-09-07 Multi-Stage Fracture 3166.00 3166.10 0
2011-09-07 Multi-Stage Fracture 3065.40 3065.50 0
2011-09-07 Multi-Stage Fracture 2976.20 2976.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 932 0.0 0.0 0.0
2012 7690 0.0 0.0 0.0
2013 6489 0.0 0.0 0.0
2014 4044 0.0 0.0 0.0
2015 8406 0.0 0.0 0.0
2016 7523 0.0 0.0 0.0
2017 7140 0.0 0.0 0.0
2018 4060 0.0 0.0 0.0
2019 8529 0.0 0.0 0.0
2020 2112 0.0 0.0 0.0

For data sources see[6]

References