X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585171501000

Well Details

Well ID: 0585171501000
Loading map...
Location: 00/01-15-058-17W5/0
Location Alias: 00/01-15-58-17 W5M
Location Alias 2: 00/01-15-058-17 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 17
Section: 15
County/Municipality: Woodlands County
Well Name: TRILOGY HZ KAYBOBS 1-15-58-17
Operator Name: Paramount Resources Ltd.
License Number: 0424934
License Date: 2010-10-21
License Status: Issued
Spud Date: 2010-12-02
Final Drill Date: 2010-12-17
Well Total Depth: 3646.00 m
Surface Hole Latitude: 54.007053
Surface Hole Longitude: -116.455397

For data sources see[1][2]

Well History

Date Event
2010-10-21 Obtained License
2010-12-05 Surface Casing Operation Performed
2010-12-06 Direction Drilling Operation Performed - Horizontal
2010-12-08 Well Log Performed
2010-12-17 Finished Drilling
2010-12-17 Well Mode changed to Drilled and Cased
2010-12-22 Liner Casing Operation Performed
2010-12-22 Production Casing Operation Performed
2010-12-22 Rig Released
2011-01-05 Well Log Performed
2011-01-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-09 Perforation Treatment Performed - Open-Hole Completion
2011-01-17 Well Began Production
2011-01-17 Well Fluid changed to Gas
2011-01-17 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-12-06 2215.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-09 Open Hole/Barefoot Completion 3640.00 3646.00 0
2011-01-09 Multi-Stage Fracture 3045.70 3127.70 0
2011-01-09 Multi-Stage Fracture 2976.00 3045.60 0
2011-01-09 Multi-Stage Fracture 2906.40 2975.90 0
2011-01-09 Multi-Stage Fracture 2823.80 2906.30 0
2011-01-09 Multi-Stage Fracture 2754.00 2823.70 0
2011-01-09 Multi-Stage Fracture 2684.30 2753.90 0
2011-01-09 Multi-Stage Fracture 2601.80 2684.20 0
2011-01-09 Multi-Stage Fracture 2557.90 2601.70 0
2011-01-09 Multi-Stage Fracture 3617.80 3640.00 0
2011-01-09 Multi-Stage Fracture 3571.50 3617.70 0
2011-01-09 Multi-Stage Fracture 3489.00 3571.40 0
2011-01-09 Multi-Stage Fracture 3419.30 3488.90 0
2011-01-09 Multi-Stage Fracture 3349.70 3419.20 0
2011-01-09 Multi-Stage Fracture 3267.10 3349.60 0
2011-01-09 Multi-Stage Fracture 3197.40 3267.00 0
2011-01-09 Multi-Stage Fracture 3127.80 3197.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6633 0.0 0.0 0.0
2012 7608 0.0 0.0 0.0
2013 6603 0.0 0.0 0.0
2014 5645 0.0 0.0 0.0
2015 5408 0.0 0.0 0.0
2016 7085 0.0 0.0 0.0
2017 5011 0.0 0.0 0.0
2018 7481 0.0 0.0 0.0
2019 8471 0.0 0.0 0.0
2020 2087 0.0 0.0 0.0

For data sources see[6]

References