X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585063206000

Well Details

Well ID: 0585063206000
Loading map...
Location: 00/06-32-058-06W5/0
Location Alias: 00/06-32-58-06 W5M
Location Alias 2: 00/06-32-058-06 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 06
Section: 32
County/Municipality: Lac Ste. Anne County
Well Name: JOURNEY HELDAR 6-32-58-6
Operator Name: Journey Energy Inc.
License Number: 0084806
License Date: 1980-08-08
License Status: Abandoned
Spud Date: 1980-08-21
Final Drill Date: 1980-08-31
Well Total Depth: 1352.00 m
Surface Hole Latitude: 54.054908
Surface Hole Longitude: -114.863387

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-08-08 Obtained License
1980-08-31 Finished Drilling
1980-08-31 Well Log Performed
1980-09-01 Drill Stem Test Performed
1980-09-02 Drill Stem Test Performed
1980-09-04 Drill Stem Test Performed
1980-09-05 Drill Stem Test Performed
1980-09-06 Production Casing Operation Performed
1980-09-07 Well Mode changed to Drilled and Cased
1981-01-14 Perforation Treatment Performed - Jet Perforation
1981-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-01-18 Perforation Treatment Performed - Jet Perforation
1981-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-09-16 Well Began Production
1987-09-16 Well Fluid changed to Gas
1987-09-16 Well Mode changed to Flowing
1991-03-30 Well Fluid changed to Gas
1991-03-30 Well Mode changed to Suspended
1995-09-20 Well Log Performed
1995-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-09-21 Plug Back Performed
1995-11-23 Perforation Treatment Performed - Cement Plug
1995-11-24 Well Abandoned
1995-11-24 Well Fluid changed to Gas
1995-11-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-01-14 Perforation 1291.50 1293.00 7
1981-01-17 Packing Device Capped w/Cement 1288.50 1291.00 0
1981-01-18 Perforation 1268.00 1273.00 7
1981-01-20 Acid Treatment 1268.00 1273.00 0
1995-09-21 Packing Device Capped w/Cement 1252.00 1260.00 0
1995-11-23 Cement Plug 148.20 265.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 2205 0.0 0.0 0.0
1988 5752 0.0 0.0 0.0
1989 8425 0.0 0.0 0.0
1990 3280 0.0 0.0 0.0
1991 243 0.0 0.0 0.0

For data sources see[5]

References