If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0585052816002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.04936,"lon":-114.676158,"icon":""}]} |
Location: 00/16-28-058-05W5/2 | |
Location Alias: 00/16-28-58-05 W5M | |
Location Alias 2: 00/16-28-058-05 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 5 | |
Range: 05 | |
Section: 28 | |
County/Municipality: County of Barrhead No. 11 | |
Well Name: TQN BARRH 16-28-58-5 | |
Operator Name: TAQA North Ltd. | |
License Number: 0284495 | |
License Date: 2003-03-13 | |
License Status: Suspension | |
Spud Date: 2003-03-21 | |
Final Drill Date: 2003-03-22 | |
Well Total Depth: 502.00 m | |
Surface Hole Latitude: 54.049360 | |
Surface Hole Longitude: -114.676158 |
Date | Event |
---|---|
2003-03-13 | Obtained License |
2003-03-21 | Surface Casing Operation Performed |
2003-03-22 | Finished Drilling |
2003-03-22 | Well Log Performed |
2003-03-22 | Well Mode changed to Drilled and Cased |
2003-03-23 | Production Casing Operation Performed |
2003-03-24 | Rig Released |
2003-03-25 | Perforation Treatment Performed - Jet Perforation |
2003-05-31 | Perforation Treatment Performed - Jet Perforation |
2003-06-02 | Perforation Treatment Performed - Jet Perforation |
2003-06-02 | Well Began Production |
2003-06-02 | Well Fluid changed to Gas |
2003-06-02 | Well Mode changed to Flowing |
2003-06-15 | Perforation Treatment Performed - Fractured |
2003-07-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-07-05 | Plug Back Performed |
2003-07-06 | Perforation Treatment Performed - Jet Perforation |
2003-07-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2003-07-08 | Perforation Treatment Performed - Cement Squeeze |
2003-07-08 | Plug Back Performed |
2003-07-09 | Perforation Treatment Performed - Cement Squeeze |
2003-07-09 | Perforation Treatment Performed - Jet Perforation |
2003-07-09 | Plug Back Performed |
2003-07-11 | Perforation Treatment Performed - Jet Perforation |
2003-07-14 | Perforation Treatment Performed - Cement Squeeze |
2003-07-14 | Plug Back Performed |
2009-08-01 | Well Fluid changed to Gas |
2009-08-01 | Well Mode changed to Suspended |
2010-03-04 | Well Fluid changed to Gas |
2010-03-04 | Well Mode changed to Flowing |
2011-07-01 | Well Fluid changed to Gas |
2011-07-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-03-25 | Perforation | 455.00 | 457.00 | 17 |
2003-07-06 | Perforation | 345.70 | 347.00 | 17 |
2003-07-08 | Acid Treatment | 345.70 | 347.00 | 0 |
2003-07-08 | Cement Squeeze | 345.70 | 347.00 | 0 |
2003-07-09 | Perforation | 292.00 | 295.00 | 17 |
2003-07-09 | Cement Squeeze | 292.00 | 295.00 | 0 |
2003-07-11 | Perforation | 232.00 | 233.00 | 17 |
2003-07-14 | Cement Squeeze | 232.00 | 233.00 | 0 |
2003-05-31 | Perforation | 466.00 | 468.00 | 13 |
2003-06-02 | Perforation | 443.00 | 444.00 | 13 |
2003-06-02 | Perforation | 405.30 | 406.10 | 13 |
2003-06-15 | Fracture | 466.00 | 468.00 | 0 |
2003-06-15 | Fracture | 455.00 | 457.00 | 0 |
2003-06-15 | Fracture | 443.00 | 444.00 | 0 |
2003-06-15 | Fracture | 405.30 | 406.10 | 0 |
2003-07-05 | Packing Device Capped w/Cement | 445.00 | 453.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 4625 | 0.0 | 0.0 | 0.0 |
2004 | 8542 | 0.0 | 0.0 | 0.0 |
2005 | 7789 | 0.0 | 0.0 | 0.0 |
2006 | 7947 | 0.0 | 0.0 | 0.0 |
2007 | 8758 | 0.0 | 0.0 | 0.0 |
2008 | 8710 | 0.0 | 0.0 | 0.0 |
2009 | 1872 | 0.0 | 0.0 | 0.0 |
2010 | 4208 | 0.0 | 0.0 | 0.0 |
2011 | 3500 | 0.0 | 0.0 | 0.0 |
For data sources see[5]