X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585050206000

Well Details

Well ID: 0585050206000
Loading map...
Location: 00/06-02-058-05W5/0
Location Alias: 00/06-02-58-05 W5M
Location Alias 2: 00/06-02-058-05 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 05
Section: 02
County/Municipality: County of Barrhead No. 11
Well Name: KAISER ET AL BARRHEAD 6-2-58-5
Operator Name: BP Canada Energy Group ULC
License Number: 0080820
License Date: 1980-02-01
License Status: RecCertified
Spud Date: 1980-02-04
Final Drill Date: 1980-02-14
Well Total Depth: 1263.00 m
Surface Hole Latitude: 53.981060
Surface Hole Longitude: -114.638988

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-02-01 Obtained License
1980-02-06 Kick Occurred
1980-02-11 Kick Occurred
1980-02-14 Finished Drilling
1980-02-16 Production Casing Operation Performed
1980-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-18 Perforation Treatment Performed - Jet Perforation
1980-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-22 Perforation Treatment Performed - Jet Perforation
1980-03-24 Perforation Treatment Performed - Cement Squeeze
1980-03-25 Perforation Treatment Performed - Jet Perforation
1980-03-27 Well Mode changed to Drilled and Cased
1983-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-10-01 Well Abandoned
1983-10-01 Well Log Performed
1983-10-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-03-18 Perforation 1252.00 1254.00 13
1983-10-01 Packing Device Capped w/Cement 322.00 330.00 0
1980-03-18 Acid Treatment 1252.00 1254.00 0
1980-03-21 Packing Device Capped w/Cement 1246.00 1246.00 0
1980-03-22 Perforation 1213.50 1215.50 13
1980-03-22 Perforation 1218.00 1219.50 13
1980-03-22 Acid Treatment 1213.50 1219.50 0
1980-03-24 Cement Squeeze 1213.50 1219.50 0
1980-03-25 Perforation 338.50 340.00 13
1980-03-25 Perforation 341.00 344.00 13

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-02-06 Kick 612.00 790.00
1980-02-11 Kick 1094.00 1094.00

For data sources see[5]

References