X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584242602002

Well Details

Well ID: 0584242602002
Loading map...
Location: 00/02-26-058-24W4/2
Location Alias: 00/02-26-58-24 W4M
Location Alias 2: 00/02-26-058-24 W4/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 24
Section: 26
County/Municipality: Westlock County
Well Name: LONG RUN FRYDEL/BONACCORD 2-26-58-24
Operator Name: Long Run Exploration Ltd.
License Number: 0180712
License Date: 1995-09-14
License Status: Suspension
Spud Date: 1995-09-17
Final Drill Date: 1995-09-20
Well Total Depth: 988.00 m
Surface Hole Latitude: 54.037141
Surface Hole Longitude: -113.457657

For data sources see[1][2]

Well History

Date Event
1995-09-14 Obtained License
1995-09-17 Surface Casing Operation Performed
1995-09-20 Finished Drilling
1995-09-20 Production Casing Operation Performed
1995-09-20 Well Log Performed
1995-09-20 Well Mode changed to Drilled and Cased
1995-09-21 Rig Released
1995-10-05 Perforation Treatment Performed - Jet Perforation
1996-01-02 Perforation Treatment Performed - Jet Perforation
1996-01-03 Perforation Treatment Performed - Jet Perforation
1996-06-24 Perforation Treatment Performed - Jet Perforation
1997-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-09 Plug Back Performed
1997-10-15 Perforation Treatment Performed - Jet Perforation
1997-10-21 Well Began Production
1997-10-21 Well Fluid changed to Crude Oil
1997-10-21 Well Mode changed to Pumping
2015-10-01 Well Fluid changed to Crude Oil
2015-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-10-05 Perforation 932.00 933.00 13
1995-10-05 Perforation 940.50 941.50 13
1996-01-02 Perforation 927.00 928.00 13
1996-01-03 Perforation 925.00 926.00 13
1996-06-24 Perforation 903.80 904.50 13
1997-02-09 Packing Device Capped w/Cement 912.00 920.00 0
1997-02-09 Packing Device Capped w/Cement 890.00 898.00 0
1997-10-15 Perforation 734.00 737.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 1712 0.0 0.0 0.0
1998 7355 0.0 0.0 0.0
1999 8224 0.0 0.0 0.0
2000 8735 0.0 0.0 0.0
2001 8735 0.0 0.0 0.0
2002 8141 0.0 0.0 0.0
2003 8001 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 1538 0.0 0.0 0.0
2010 4896 0.0 0.0 0.0
2011 4632 0.0 0.0 0.0
2012 5424 0.0 0.0 0.0
2013 4512 0.0 0.0 0.0
2014 1986 0.0 0.0 0.0

For data sources see[5]

References