0584230207002

Well Details

Well ID: 0584230207002
Loading map...
Location: 00/07-02-058-23W4/2
Location Alias: 00/07-02-58-23 W4M
Location Alias 2: 00/07-02-058-23 W4/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 23
Section: 02
County/Municipality: Thorhild County
Well Name: DORSET REDWATER 7-2-58-23
Operator Name: Baytex Energy Ltd.
License Number: 0032113
License Date: 1967-05-16
License Status: Abandoned
Spud Date: 1967-06-14
Final Drill Date: 1967-06-21
Well Total Depth: 1088.10 m
Surface Hole Latitude: 53.982430
Surface Hole Longitude: -113.309091

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-05-16 Obtained License
1967-06-18 Drill Stem Test Performed
1967-06-21 Finished Drilling
1967-06-21 Well Mode changed to Drilled and Cased
1967-06-22 Drill Stem Test Performed
1967-06-23 Production Casing Operation Performed
1975-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-07-24 Perforation Treatment Performed - Jet Perforation
1977-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-05-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-05-20 Perforation Treatment Performed - Jet Perforation
1977-06-23 Perforation Treatment Performed - Fractured
1977-06-27 Well Began Production
1977-06-27 Well Fluid changed to Gas
1977-06-27 Well Mode changed to Flowing
1992-10-01 Well Fluid changed to Gas
1992-10-01 Well Mode changed to Suspended
1994-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-07 Perforation Treatment Performed - Jet Perforation
1994-09-07 Plug Back Performed
1994-09-07 Well Fluid changed to Gas
1994-09-07 Well Log Performed
1994-09-07 Well Mode changed to Abandoned
1994-09-08 Perforation Treatment Performed - Remedial Casing
1994-09-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-07-24 Perforation 894.30 895.20 7
1994-09-08 Remedial Casing Cementing 254.70 345.30 0
1975-07-24 Acid Treatment 894.30 895.20 0
1977-05-20 Packing Device Capped w/Cement 875.10 883.90 0
1977-05-20 Perforation 690.10 692.80 7
1977-05-20 Acid Treatment 690.10 692.80 0
1977-06-23 Fracture 690.10 692.80 0
1994-09-07 Packing Device Capped w/Cement 670.00 678.00 0
1994-09-07 Perforation 254.70 255.00 7
1994-09-07 Perforation 345.00 345.30 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 3930 0.0 0.0 0.0
1978 7933 0.0 0.0 0.0
1979 8004 0.0 0.0 0.0
1980 5262 0.0 0.0 0.0
1981 4542 0.0 0.0 0.0
1982 7043 0.0 0.0 0.0
1983 6669 0.0 0.0 0.0
1984 6776 0.0 0.0 0.0
1985 6984 0.0 0.0 0.0
1986 6792 0.0 0.0 0.0
1987 4392 0.0 0.0 0.0
1988 4463 0.0 0.0 0.0
1989 3897 0.0 0.0 0.0
1990 3305 0.0 0.0 0.0
1991 2045 0.0 0.0 0.0

For data sources see[5]