Well ID: 0584230203000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.982546,"lon":-113.296912,"icon":""}]} |
Location: 00/03-02-058-23W4/0 | |
Location Alias: 00/03-02-58-23 W4M | |
Location Alias 2: 00/03-02-058-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 4 | |
Range: 23 | |
Section: 02 | |
County/Municipality: Thorhild County | |
Well Name: SURE ENERGY HZ REDWATER 3-2-58-23 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0423761 | |
License Date: 2010-09-22 | |
License Status: Suspension | |
Spud Date: 2010-10-03 | |
Final Drill Date: 2010-10-13 | |
Well Total Depth: 1741.00 m | |
Surface Hole Latitude: 53.982546 | |
Surface Hole Longitude: -113.296912 |
Date | Event |
---|---|
2010-09-22 | Obtained License |
2010-10-04 | Surface Casing Operation Performed |
2010-10-05 | Direction Drilling Operation Performed - Horizontal |
2010-10-05 | Well Log Performed |
2010-10-08 | Production Casing Operation Performed |
2010-10-13 | Finished Drilling |
2010-10-13 | Well Structure changed to Drain |
2010-10-18 | Perforation Treatment Performed - Open-Hole Completion |
2010-10-18 | Rig Released |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-10-05 | 354.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-10-18 | Open Hole/Barefoot Completion | 999.00 | 1741.00 | 0 |
For data sources see[5]