X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584222114000

Well Details

Well ID: 0584222114000
Loading map...
Location: 00/14-21-058-22W4/0
Location Alias: 00/14-21-58-22 W4M
Location Alias 2: 00/14-21-058-22 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 22
Section: 21
County/Municipality: Thorhild County
Well Name: IMPERIAL OPAL NO. 22
Operator Name: Imperial Oil Limited
License Number: 0001649
License Date: 1950-06-22
License Status: RecCertified
Spud Date: 1950-07-30
Final Drill Date: 1950-09-05
Well Total Depth: 1009.50 m
Surface Hole Latitude: 54.034358
Surface Hole Longitude: -113.214201

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-06-22 Obtained License
1950-07-30 Direction Drilling Operation Performed - 98
1950-09-03 Production Casing Operation Performed
1950-09-05 Finished Drilling
1950-09-05 Perforation Treatment Performed - Open-Hole Completion
1950-09-05 Well Mode changed to Drilled and Cased
1950-09-08 Perforation Treatment Performed - Acid Wash - No Pressure
1950-09-08 Well Began Production
1950-09-08 Well Fluid changed to Crude Oil
1950-09-08 Well Mode changed to Flowing
1950-11-27 Well Fluid changed to Crude Oil
1950-11-27 Well Mode changed to Pumping
1956-07-12 Perforation Treatment Performed - Open-Hole Completion
1956-07-12 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1957-07-13 Perforation Treatment Performed - Open-Hole Completion
1957-07-15 Perforation Treatment Performed - Open-Hole Completion
1957-07-15 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1959-06-09 Perforation Treatment Performed - Open-Hole Completion
1959-06-09 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1963-03-30 Perforation Treatment Performed - Open-Hole Completion
1964-04-01 Perforation Treatment Performed - Open-Hole Completion
1964-04-01 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1966-12-19 Perforation Treatment Performed - Cement Plug
1966-12-21 Well Abandoned
1966-12-21 Well Fluid changed to Crude Oil
1966-12-21 Well Mode changed to Abandoned
1995-08-10 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1950-07-30 938.80 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-09-05 Open Hole/Barefoot Completion 989.40 1009.50 0
1963-03-30 Open Hole/Barefoot Completion 989.40 1002.20 0
1964-04-01 Resin-Gypsum Squeeze or Plug 993.60 1002.20 0
1964-04-01 Open Hole/Barefoot Completion 989.40 993.60 0
1966-12-19 Cement Plug 937.60 989.40 0
1950-09-08 Acid Wash 989.40 1009.50 0
1956-07-12 Resin-Gypsum Squeeze or Plug 997.30 1009.50 0
1956-07-12 Open Hole/Barefoot Completion 989.40 997.30 0
1957-07-13 Open Hole/Barefoot Completion 989.40 999.10 0
1957-07-15 Resin-Gypsum Squeeze or Plug 994.90 999.10 0
1957-07-15 Open Hole/Barefoot Completion 989.40 994.90 0
1959-06-09 Resin-Gypsum Squeeze or Plug 993.30 994.90 0
1959-06-09 Open Hole/Barefoot Completion 989.40 993.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[6]

References