X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584221607000

Well Details

Well ID: 0584221607000
Loading map...
Location: 00/07-16-058-22W4/0
Location Alias: 00/07-16-58-22 W4M
Location Alias 2: 00/07-16-058-22 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 22
Section: 16
County/Municipality: Thorhild County
Well Name: ESSO REDWATER D-1
Operator Name: Imperial Oil Resources Limited
License Number: 0001349
License Date: 1950-04-12
License Status: Abandoned
Spud Date: 1950-04-28
Final Drill Date: 1950-05-13
Well Total Depth: 992.70 m
Surface Hole Latitude: 54.012684
Surface Hole Longitude: -113.208142

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-04-12 Obtained License
1950-05-10 Production Casing Operation Performed
1950-05-13 Finished Drilling
1950-05-13 Perforation Treatment Performed - Open-Hole Completion
1950-05-13 Well Mode changed to Drilled and Cased
1950-05-14 Perforation Treatment Performed - Acid Wash - No Pressure
1950-05-14 Well Began Production
1950-05-14 Well Fluid changed to Crude Oil
1950-05-14 Well Mode changed to Flowing
1950-10-16 Well Fluid changed to Crude Oil
1950-10-16 Well Mode changed to Pumping
1962-10-18 Perforation Treatment Performed - Selective Jet Perforations
1975-09-01 Well Fluid changed to Crude Oil
1975-09-01 Well Mode changed to Suspended
1976-10-07 Well Fluid changed to Crude Oil
1976-10-07 Well Mode changed to Pumping
1981-10-15 Well Fluid changed to Crude Oil
1981-10-15 Well Mode changed to Suspended
1982-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-03 Perforation Treatment Performed - Jet Perforation
1994-10-18 Perforation Treatment Performed - Cement Squeeze
1994-10-18 Plug Back Performed
1994-10-20 Perforation Treatment Performed - Open-Hole Completion
1994-10-21 Well Log Performed
1994-11-01 Well Fluid changed to Crude Oil
1994-11-01 Well Mode changed to Pumping
1996-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-01-18 Plug Back Performed
1996-01-18 Well Fluid changed to Crude Oil
1996-01-18 Well Mode changed to Abandoned Zone
1996-01-24 Perforation Treatment Performed - Jet Perforation
1996-04-23 Perforation Treatment Performed - Remedial Casing
1996-05-08 Well Abandoned
1996-05-08 Well Fluid changed to Crude Oil
1996-05-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-05-13 Open Hole/Barefoot Completion 976.60 992.70 0
1996-01-18 Packing Device Capped w/Cement 961.30 969.30 0
1996-01-24 Perforation 222.00 223.00 13
1996-04-23 Remedial Casing Cementing 222.00 223.00 0
1950-05-14 Acid Wash 976.60 992.70 0
1962-10-18 Selective Jet Perforations 982.70 982.70 0
1982-03-23 Packing Device Capped w/Cement 970.00 970.00 0
1982-08-03 Perforation 502.50 504.80 7
1982-08-03 Acid Treatment 502.50 504.80 0
1994-10-18 Cement Squeeze 502.50 504.80 0
1994-10-20 Open Hole/Barefoot Completion 976.60 992.70 0
1994-10-20 Open Hole/Barefoot Completion 982.70 982.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8724 0.0 0.0 0.0
1968 8749 0.0 0.0 0.0
1969 8697 0.0 0.0 0.0
1970 8716 0.0 0.0 0.0
1971 8742 0.0 0.0 0.0
1972 8634 0.0 0.0 0.0
1973 8731 0.0 0.0 0.0
1974 8747 0.0 0.0 0.0
1975 5900 0.0 0.0 0.0
1976 1642 0.0 0.0 0.0
1977 7781 0.0 0.0 0.0
1978 8098 0.0 0.0 0.0
1979 3457 0.0 0.0 0.0
1980 1426 0.0 0.0 0.0
1994 670 0.0 0.0 0.0
1995 1082 0.0 0.0 0.0

For data sources see[5]

References