X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584221603000

Well Details

Well ID: 0584221603000
Loading map...
Location: 00/03-16-058-22W4/0
Location Alias: 00/03-16-58-22 W4M
Location Alias 2: 00/03-16-058-22 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 22
Section: 16
County/Municipality: Thorhild County
Well Name: BLAIR REDWATER 3-16-58-22
Operator Name: Blair Oil Company
License Number: 0001441
License Date: 1950-05-09
License Status: RecCertified
Spud Date: 1950-05-13
Final Drill Date: 1950-05-24
Well Total Depth: 995.50 m
Surface Hole Latitude: 54.009521
Surface Hole Longitude: -113.214203

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-05-09 Obtained License
1950-05-21 Liner Casing Operation Performed
1950-05-24 Finished Drilling
1950-05-24 Perforation Treatment Performed - Open-Hole Completion
1950-05-24 Well Mode changed to Drilled and Cased
1950-05-25 Perforation Treatment Performed - Acid Wash - No Pressure
1950-05-25 Well Began Production
1950-05-25 Well Fluid changed to Crude Oil
1950-05-25 Well Mode changed to Flowing
1950-06-12 Well Fluid changed to Crude Oil
1950-06-12 Well Mode changed to Pumping
1951-06-07 Perforation Treatment Performed - Open-Hole Completion
1951-06-07 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1951-06-19 Perforation Treatment Performed - Cement Plug
1951-06-19 Perforation Treatment Performed - Open-Hole Completion
1951-09-05 Drill Stem Test Performed
1951-09-05 Perforation Treatment Performed - Bullet Perforation
1951-09-06 Drill Stem Test Performed
1951-09-06 Perforation Treatment Performed - Bullet Perforation
1951-09-07 Drill Stem Test Performed
1951-09-07 Perforation Treatment Performed - Bullet Perforation
1951-09-08 Drill Stem Test Performed
1951-09-08 Perforation Treatment Performed - Bullet Perforation
1951-09-10 Drill Stem Test Performed
1951-09-10 Perforation Treatment Performed - Bullet Perforation
1951-09-11 Perforation Treatment Performed - Bullet Perforation
1951-09-13 Drill Stem Test Performed
1951-09-13 Perforation Treatment Performed - Bullet Perforation
1951-09-14 Drill Stem Test Performed
1951-09-14 Perforation Treatment Performed - Bullet Perforation
1951-09-15 Drill Stem Test Performed
1951-09-15 Perforation Treatment Performed - Bullet Perforation
1951-09-17 Drill Stem Test Performed
1951-09-17 Perforation Treatment Performed - Bullet Perforation
1951-09-20 Perforation Treatment Performed - Acid Wash - No Pressure
1956-08-07 Perforation Treatment Performed - Acid Wash - No Pressure
1959-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-06-01 Perforation Treatment Performed - Jet Perforation
1963-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-08-20 Well Fluid changed to Crude Oil
1965-08-20 Well Mode changed to Suspended
1968-05-07 Perforation Treatment Performed - Cement Plug
1968-05-09 Well Abandoned
1968-05-09 Well Fluid changed to Crude Oil
1968-05-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-05-24 Open Hole/Barefoot Completion 984.50 995.50 0
1951-09-08 Bullet Perforation 985.70 986.00 13
1951-09-10 Bullet Perforation 986.00 986.30 13
1951-09-11 Bullet Perforation 986.30 986.60 13
1951-09-13 Bullet Perforation 986.60 986.90 13
1951-09-14 Bullet Perforation 986.90 987.20 13
1951-09-15 Bullet Perforation 987.20 987.60 13
1951-09-17 Bullet Perforation 984.50 987.60 13
1951-09-20 Acid Wash 984.50 987.60 0
1956-08-07 Acid Wash 984.50 987.60 0
1959-07-24 Acid Treatment 984.50 987.60 0
1950-05-25 Acid Wash 984.50 995.50 0
1960-06-01 Perforation 980.80 983.90 13
1963-02-21 Acid Treatment 980.80 987.60 0
1968-05-07 Cement Plug 960.10 995.50 0
1951-06-07 Resin-Gypsum Squeeze or Plug 994.60 995.50 0
1951-06-07 Open Hole/Barefoot Completion 984.50 994.60 0
1951-06-19 Cement Plug 990.60 994.60 0
1951-06-19 Open Hole/Barefoot Completion 984.50 990.60 0
1951-09-05 Bullet Perforation 984.50 984.80 13
1951-09-06 Bullet Perforation 984.80 985.40 13
1951-09-07 Bullet Perforation 985.40 985.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 388 0.0 0.0 0.0
1968 0 0.0 0.0 0.0

For data sources see[5]

References