X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584221516000

Well Details

Well ID: 0584221516000
Loading map...
Location: 00/16-15-058-22W4/0
Location Alias: 00/16-15-58-22 W4M
Location Alias 2: 00/16-15-058-22 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 22
Section: 15
County/Municipality: Thorhild County
Well Name: ACCEL HOLDINGS REDWATER 16-15-58-22
Operator Name: ACCEL Canada Holdings Limited
License Number: 0000919
License Date: 1949-11-19
License Status: Suspension
Spud Date: 1949-12-01
Final Drill Date: 1949-12-15
Well Total Depth: 1000.40 m
Surface Hole Latitude: 54.019865
Surface Hole Longitude: -113.177223

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-11-19 Obtained License
1949-12-10 Production Casing Operation Performed
1949-12-15 Finished Drilling
1949-12-15 Perforation Treatment Performed - Open-Hole Completion
1949-12-15 Well Mode changed to Drilled and Cased
1949-12-17 Well Began Production
1949-12-17 Well Fluid changed to Crude Oil
1949-12-17 Well Mode changed to Flowing
1950-06-01 Well Fluid changed to Crude Oil
1950-06-01 Well Mode changed to Pumping
1983-07-01 Well Fluid changed to Crude Oil
1983-07-01 Well Mode changed to Suspended
1992-09-22 Well Log Performed
1992-09-27 Well Log Performed
1992-10-01 Well Fluid changed to Crude Oil
1992-10-01 Well Mode changed to Pumping
1992-10-08 Perforation Treatment Performed - Jet Perforation
1992-10-08 Well Log Performed
1992-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-12-01 Well Fluid changed to Crude Oil
1999-12-01 Well Mode changed to Suspended
2001-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-07-23 Plug Back Performed
2001-07-23 Well Fluid changed to Crude Oil
2001-07-23 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-12-15 Open Hole/Barefoot Completion 983.00 1000.40 0
1992-10-08 Perforation 989.20 990.20 13
1992-10-13 Acid Treatment 989.20 990.20 0
2001-07-23 Packing Device Capped w/Cement 967.00 975.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1992 1702 0.0 0.0 0.0
1993 8449 0.0 0.0 0.0
1994 8331 0.0 0.0 0.0
1995 8733 0.0 0.0 0.0
1996 8755 0.0 0.0 0.0
1997 8684 0.0 0.0 0.0
1998 8530 0.0 0.0 0.0
1999 2137 0.0 0.0 0.0

For data sources see[5]

References