X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584221306000

Well Details

Well ID: 0584221306000
Loading map...
Location: 00/06-13-058-22W4/0
Location Alias: 00/06-13-58-22 W4M
Location Alias 2: 00/06-13-058-22 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 22
Section: 13
County/Municipality: Thorhild County
Well Name: ACCEL HOLDINGS REDWATER 6-13-58-22
Operator Name: ACCEL Canada Holdings Limited
License Number: 0002725
License Date: 1951-03-27
License Status: Issued
Spud Date: 1951-05-07
Final Drill Date: 1951-05-15
Well Total Depth: 1005.80 m
Surface Hole Latitude: 54.012602
Surface Hole Longitude: -113.140633

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-03-27 Obtained License
1951-05-15 Finished Drilling
1951-05-15 Well Mode changed to Drilled and Cased
1951-05-16 Perforation Treatment Performed - Open-Hole Completion
1951-05-16 Production Casing Operation Performed
1951-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-05-27 Well Began Production
1951-05-27 Well Fluid changed to Crude Oil
1951-05-27 Well Mode changed to Flowing
1951-07-12 Well Fluid changed to Crude Oil
1951-07-12 Well Mode changed to Pumping
2002-06-20 Perforation Treatment Performed - Jet Perforation
2002-06-20 Perforation Treatment Performed - Open-Hole Completion
2002-06-20 Well Log Performed
2002-07-01 Well Fluid changed to Crude Oil
2002-07-01 Well Mode changed to Suspended
2009-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-03-12 Well Fluid changed to Crude Oil
2009-03-12 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-05-16 Open Hole/Barefoot Completion 981.80 1005.80 0
1951-05-19 Acid Treatment 981.80 1005.80 0
2002-06-20 Perforation 980.20 982.00 13
2002-06-20 Open Hole/Barefoot Completion 981.80 983.60 0
2009-02-19 Acid Treatment 980.20 983.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1973 1929 0.0 0.0 0.0
1974 6793 0.0 0.0 0.0
1975 8419 0.0 0.0 0.0
1976 8650 0.0 0.0 0.0
1977 8393 0.0 0.0 0.0
1978 8167 0.0 0.0 0.0
1979 8295 0.0 0.0 0.0
1980 8398 0.0 0.0 0.0
1981 8545 0.0 0.0 0.0
1982 8297 0.0 0.0 0.0
1983 8502 0.0 0.0 0.0
1984 8595 0.0 0.0 0.0
1985 8532 0.0 0.0 0.0
1986 8432 0.0 0.0 0.0
1987 8379 0.0 0.0 0.0
1988 8136 0.0 0.0 0.0
1989 8333 0.0 0.0 0.0
1990 8517 0.0 0.0 0.0
1991 8707 0.0 0.0 0.0
1992 7056 0.0 0.0 0.0
1993 8276 0.0 0.0 0.0
1994 8225 0.0 0.0 0.0
1995 8670 0.0 0.0 0.0
1996 8758 0.0 0.0 0.0
1997 8716 0.0 0.0 0.0
1998 8529 0.0 0.0 0.0
1999 8316 0.0 0.0 0.0
2000 6196 0.0 0.0 0.0
2001 8326 0.0 0.0 0.0
2002 2355 0.0 0.0 0.0
2009 7065 0.0 0.0 0.0
2010 8664 0.0 0.0 0.0
2011 8684 0.0 0.0 0.0
2012 8187 0.0 0.0 0.0
2013 7487 0.0 0.0 0.0
2014 6463 0.0 0.0 0.0
2015 7611 0.0 0.0 0.0
2016 8071 0.0 0.0 0.0
2017 8595 0.0 0.0 0.0
2018 8057 0.0 0.0 0.0
2019 7747 0.0 0.0 0.0
2020 2011 0.0 0.0 0.0

For data sources see[5]

References