X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584221206000

Well Details

Well ID: 0584221206000
Loading map...
Location: 00/06-12-058-22W4/0
Location Alias: 00/06-12-58-22 W4M
Location Alias 2: 00/06-12-058-22 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 22
Section: 12
County/Municipality: Thorhild County
Well Name: IMPERIAL EGREMONT NO. 66
Operator Name: Imperial Oil Resources Limited
License Number: 0001611
License Date: 1950-06-14
License Status: RecCertified
Spud Date: 1950-06-24
Final Drill Date: 1950-07-03
Well Total Depth: 987.60 m
Surface Hole Latitude: 53.997964
Surface Hole Longitude: -113.139896

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-06-14 Obtained License
1950-06-30 Production Casing Operation Performed
1950-07-03 Finished Drilling
1950-07-03 Perforation Treatment Performed - Acid Wash - No Pressure
1950-07-03 Perforation Treatment Performed - Open-Hole Completion
1950-07-03 Well Mode changed to Drilled and Cased
1950-07-04 Well Began Production
1950-07-04 Well Fluid changed to Crude Oil
1950-07-04 Well Mode changed to Flowing
1951-01-29 Well Fluid changed to Crude Oil
1951-01-29 Well Mode changed to Pumping
1984-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-17 Well Log Performed
1986-04-01 Well Fluid changed to Crude Oil
1986-04-01 Well Mode changed to Suspended
1995-04-01 Well Type changed to Observation
1996-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-01-11 Perforation Treatment Performed - Jet Perforation
1996-01-11 Plug Back Performed
1996-01-11 Well Log Performed
1996-04-24 Perforation Treatment Performed - Remedial Casing
1996-05-10 Well Abandoned
1996-05-10 Well Mode changed to Abandoned
1996-05-10 Well Type changed to Observation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-07-03 Open Hole/Barefoot Completion 963.50 987.60 0
1950-07-03 Acid Wash 963.50 987.60 0
1984-05-25 Acid Treatment 963.50 971.00 0
1996-01-11 Packing Device Capped w/Cement 947.00 955.00 0
1996-01-11 Perforation 217.00 218.00 13
1996-04-24 Remedial Casing Cementing 217.00 218.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6739 0.0 0.0 0.0
1968 7095 0.0 0.0 0.0
1969 8222 0.0 0.0 0.0
1970 6795 0.0 0.0 0.0
1971 7009 0.0 0.0 0.0
1972 6172 0.0 0.0 0.0
1973 8005 0.0 0.0 0.0
1974 8016 0.0 0.0 0.0
1975 8286 0.0 0.0 0.0
1976 7920 0.0 0.0 0.0
1977 8327 0.0 0.0 0.0
1978 7089 0.0 0.0 0.0
1979 7869 0.0 0.0 0.0
1980 8157 0.0 0.0 0.0
1981 8513 0.0 0.0 0.0
1982 8113 0.0 0.0 0.0
1983 7928 0.0 0.0 0.0
1984 5656 0.0 0.0 0.0
1985 7829 0.0 0.0 0.0
1986 1354 0.0 0.0 0.0

For data sources see[5]

References