X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584221107000

Well Details

Well ID: 0584221107000
Loading map...
Location: 00/07-11-058-22W4/0
Location Alias: 00/07-11-58-22 W4M
Location Alias 2: 00/07-11-058-22 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 22
Section: 11
County/Municipality: Thorhild County
Well Name: ACCEL HOLDINGS REDWATER 7-11-58-22
Operator Name: ACCEL Canada Holdings Limited
License Number: 0001222
License Date: 1950-03-03
License Status: Abandoned
Spud Date: 1950-03-22
Final Drill Date: 1950-03-31
Well Total Depth: 967.70 m
Surface Hole Latitude: 53.997994
Surface Hole Longitude: -113.158619

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-03-03 Obtained License
1950-03-29 Production Casing Operation Performed
1950-03-31 Finished Drilling
1950-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-03-31 Perforation Treatment Performed - Open-Hole Completion
1950-03-31 Well Mode changed to Drilled and Cased
1950-04-01 Well Began Production
1950-04-01 Well Fluid changed to Crude Oil
1950-04-01 Well Mode changed to Flowing
1950-12-21 Well Fluid changed to Crude Oil
1950-12-21 Well Mode changed to Pumping
1967-09-08 Perforation Treatment Performed - Open-Hole Completion
1967-09-08 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1976-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-16 Perforation Treatment Performed - Cement Plug
1976-06-16 Perforation Treatment Performed - Open-Hole Completion
1976-08-01 Well Fluid changed to Crude Oil
1976-08-01 Well Mode changed to Suspended
1982-03-15 Well Fluid changed to Crude Oil
1982-03-15 Well Mode changed to Pumping
1982-07-01 Well Fluid changed to Crude Oil
1982-07-01 Well Mode changed to Suspended
1985-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-07-04 Perforation Treatment Performed - Jet Perforation
1985-07-04 Plug Back Performed
1985-07-04 Well Fluid changed to Crude Oil
1985-07-04 Well Log Performed
1985-07-04 Well Mode changed to Abandoned Zone
1985-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-07-29 Plug Back Performed
1985-07-30 Perforation Treatment Performed - Jet Perforation
1985-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-10-16 Plug Back Performed
1985-10-17 Perforation Treatment Performed - Jet Perforation
1985-10-17 Well Log Performed
1985-10-21 Perforation Treatment Performed - Jet Perforation
1985-10-21 Well Log Performed
1985-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-11-19 Plug Back Performed
1985-11-20 Perforation Treatment Performed - Jet Perforation
1985-11-20 Well Log Performed
1996-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-18 Plug Back Performed
1996-04-20 Perforation Treatment Performed - Jet Perforation
1996-04-24 Perforation Treatment Performed - Remedial Casing
1996-05-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-03-31 Open Hole/Barefoot Completion 951.60 967.70 0
1985-07-29 Packing Device Capped w/Cement 862.00 870.00 0
1985-07-30 Perforation 743.00 746.00 13
1985-10-16 Packing Device Capped w/Cement 724.00 732.00 0
1985-10-17 Perforation 653.00 656.00 13
1985-10-21 Perforation 643.00 647.00 13
1985-11-19 Packing Device Capped w/Cement 627.00 635.00 0
1985-11-20 Perforation 606.00 607.50 13
1996-03-18 Packing Device Capped w/Cement 591.50 599.50 0
1996-04-20 Perforation 215.00 216.00 13
1996-04-24 Remedial Casing Cementing 215.00 216.00 0
1950-03-31 Acid Treatment 951.60 967.70 0
1967-09-08 Resin-Gypsum Squeeze or Plug 962.60 967.70 0
1967-09-08 Open Hole/Barefoot Completion 954.90 966.80 0
1976-05-20 Acid Treatment 954.90 966.80 0
1976-06-16 Cement Plug 962.60 966.80 0
1976-06-16 Open Hole/Barefoot Completion 954.90 962.60 0
1985-07-04 Packing Device Capped w/Cement 940.00 950.00 0
1985-07-04 Perforation 881.50 884.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7598 0.0 0.0 0.0
1968 7282 0.0 0.0 0.0
1969 8625 0.0 0.0 0.0
1970 8340 0.0 0.0 0.0
1971 7923 0.0 0.0 0.0
1972 7928 0.0 0.0 0.0
1973 8172 0.0 0.0 0.0
1974 8394 0.0 0.0 0.0
1975 8342 0.0 0.0 0.0
1976 4729 0.0 0.0 0.0
1982 2589 0.0 0.0 0.0

For data sources see[5]

References