X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584220103000

Well Details

Well ID: 0584220103000
Loading map...
Location: 00/03-01-058-22W4/0
Location Alias: 00/03-01-58-22 W4M
Location Alias 2: 00/03-01-058-22 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 22
Section: 01
County/Municipality: Thorhild County
Well Name: IMPERIAL EGREMONT NO. 4
Operator Name: Imperial Oil Resources Limited
License Number: 0000420
License Date: 1949-07-30
License Status: RecCertified
Spud Date: 1949-08-17
Final Drill Date: 1949-08-30
Well Total Depth: 993.60 m
Surface Hole Latitude: 53.979889
Surface Hole Longitude: -113.139915

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-07-30 Obtained License
1949-08-26 Production Casing Operation Performed
1949-08-30 Finished Drilling
1949-08-30 Perforation Treatment Performed - Acid Wash - No Pressure
1949-08-30 Perforation Treatment Performed - Open-Hole Completion
1949-08-30 Well Mode changed to Drilled and Cased
1949-09-01 Well Began Production
1949-09-01 Well Fluid changed to Crude Oil
1949-09-01 Well Mode changed to Flowing
1950-06-16 Well Fluid changed to Crude Oil
1950-06-16 Well Mode changed to Pumping
1977-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-07 Perforation Treatment Performed - Cement Plug
1983-06-07 Perforation Treatment Performed - Open-Hole Completion
1984-03-01 Well Fluid changed to Crude Oil
1984-03-01 Well Mode changed to Suspended
1996-01-09 Well Log Performed
1996-01-10 Perforation Treatment Performed - Cement Plug
1996-01-10 Perforation Treatment Performed - Open-Hole Completion
1996-01-11 Well Log Performed
1996-02-01 Well Fluid changed to Crude Oil
1996-02-01 Well Mode changed to Pumping
1996-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-22 Plug Back Performed
1996-04-20 Perforation Treatment Performed - Jet Perforation
1996-06-03 Perforation Treatment Performed - Remedial Casing
1996-07-12 Well Abandoned
1996-07-12 Well Fluid changed to Crude Oil
1996-07-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-08-30 Open Hole/Barefoot Completion 968.30 993.60 0
1996-06-03 Remedial Casing Cementing 215.00 216.00 0
1949-08-30 Acid Wash 968.30 993.60 0
1977-09-16 Acid Treatment 968.30 993.60 0
1983-06-07 Cement Plug 975.10 993.60 0
1983-06-07 Open Hole/Barefoot Completion 968.30 975.10 0
1996-01-10 Cement Plug 969.90 975.10 0
1996-01-10 Open Hole/Barefoot Completion 968.30 969.90 0
1996-03-22 Packing Device Capped w/Cement 951.40 959.40 0
1996-04-20 Perforation 215.00 216.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1973 4048 0.0 0.0 0.0
1974 8171 0.0 0.0 0.0
1975 7979 0.0 0.0 0.0
1976 8309 0.0 0.0 0.0
1977 7602 0.0 0.0 0.0
1982 1980 0.0 0.0 0.0
1983 4935 0.0 0.0 0.0
1996 674 0.0 0.0 0.0

For data sources see[5]

References