X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584212603003

Well Details

Well ID: 0584212603003
Loading map...
Location: 00/03-26-058-21W4/3
Location Alias: 00/03-26-58-21 W4M
Location Alias 2: 00/03-26-058-21 W4/03
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 21
Section: 26
County/Municipality: Thorhild County
Well Name: CNRL REDWATER 3-26-58-21
Operator Name: Canadian Natural Resources Limited
License Number: 0159209
License Date: 1993-06-17
License Status: Suspension
Spud Date: 1993-06-29
Final Drill Date: 1993-07-02
Well Total Depth: 806.00 m
Surface Hole Latitude: 54.039636
Surface Hole Longitude: -113.017128

For data sources see[1][2]

Well History

Date Event
1993-06-17 Obtained License
1993-06-30 Surface Casing Operation Performed
1993-07-02 Finished Drilling
1993-07-02 Well Log Performed
1993-07-02 Well Mode changed to Drilled and Cased
1993-07-03 Production Casing Operation Performed
1993-07-03 Rig Released
1993-07-24 Perforation Treatment Performed - Jet Perforation
2001-05-11 Well Log Performed
2001-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-12 Perforation Treatment Performed - Jet Perforation
2001-05-12 Plug Back Performed
2001-05-12 Well Log Performed
2001-05-13 Perforation Treatment Performed - Jet Perforation
2001-05-13 Well Log Performed
2001-05-13 Well Mode changed to Drilled and Cased
2001-08-02 Well Log Performed
2001-08-03 Perforation Treatment Performed - Jet Perforation
2001-08-03 Well Log Performed
2009-11-01 Well Began Production
2009-11-01 Well Fluid changed to Gas
2009-11-01 Well Mode changed to Flowing
2011-10-18 Perforation Treatment Performed - Jet Perforation
2011-10-18 Well Log Performed
2011-10-20 Well Fluid changed to Gas
2011-10-20 Well Mode changed to Flowing
2012-06-30 Well Fluid changed to Gas
2012-06-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-07-24 Perforation 781.90 782.40 13
1993-07-24 Perforation 783.00 787.00 13
1993-07-24 Perforation 789.30 789.70 13
2001-05-12 Packing Device Capped w/Cement 768.00 776.00 0
2001-05-12 Perforation 743.00 745.00 17
2001-05-13 Perforation 647.00 649.30 17
2001-08-03 Perforation 607.00 608.00 17
2011-10-18 Perforation 717.00 717.60 26
2011-10-18 Perforation 695.00 696.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 1400 0.0 0.0 0.0
2010 7739 0.0 0.0 0.0
2011 7007 0.0 0.0 0.0

For data sources see[5]

References