X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584210805003

Well Details

Well ID: 0584210805003
Loading map...
Location: 00/05-08-058-21W4/3
Location Alias: 00/05-08-58-21 W4M
Location Alias 2: 00/05-08-058-21 W4/03
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 21
Section: 08
County/Municipality: Thorhild County
Well Name: ESSO REDWATER #B-9 WELL
Operator Name: Imperial Oil Resources Limited
License Number: 0000841
License Date: 1949-11-03
License Status: Abandoned
Spud Date: 1967-09-08
Final Drill Date: 1967-09-13
Well Total Depth: 1016.20 m
Surface Hole Latitude: 53.997916
Surface Hole Longitude: -113.096549

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-11-03 Obtained License
1950-01-04 Perforation Treatment Performed - Open-Hole Completion
1954-08-17 Perforation Treatment Performed - Bullet Perforation
1955-01-28 Perforation Treatment Performed - Fractured
1965-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1967-09-13 Finished Drilling
1967-09-13 Perforation Treatment Performed - Open-Hole Completion
1967-09-13 Well Mode changed to Drilled and Cased
1967-09-27 Well Began Production
1967-09-27 Well Fluid changed to Crude Oil
1967-09-27 Well Mode changed to Pumping
1983-07-01 Well Fluid changed to Crude Oil
1983-07-01 Well Mode changed to Suspended
1996-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-14 Plug Back Performed
1996-03-14 Well Log Performed
1996-04-21 Perforation Treatment Performed - Jet Perforation
1996-06-02 Perforation Treatment Performed - Remedial Casing
1996-07-11 Well Abandoned
1996-07-11 Well Fluid changed to Crude Oil
1996-07-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-01-04 Open Hole/Barefoot Completion 1008.60 1016.20 0
1996-06-02 Remedial Casing Cementing 192.00 193.00 0
1954-08-17 Bullet Perforation 1009.50 1012.90 43
1954-08-17 Bullet Perforation 1007.70 1008.90 13
1955-01-28 Fracture 1007.70 1016.20 0
1965-09-23 Packing Device Capped w/Cement 990.60 990.60 0
1967-09-13 Open Hole/Barefoot Completion 1008.60 1016.20 0
1996-03-14 Packing Device Capped w/Cement 985.00 993.00 0
1996-03-14 Packing Device Capped w/Cement 350.00 600.00 0
1996-04-21 Perforation 192.00 193.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 336 0.0 0.0 0.0

For data sources see[5]

References