X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584210712000

Well Details

Well ID: 0584210712000
Loading map...
Location: 00/12-07-058-21W4/0
Location Alias: 00/12-07-58-21 W4M
Location Alias 2: 00/12-07-058-21 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 21
Section: 07
County/Municipality: Thorhild County
Well Name: ACCEL HOLDINGS REDWATER 12-7-58-21
Operator Name: ACCEL Canada Holdings Limited
License Number: 0002251
License Date: 1950-11-08
License Status: Issued
Spud Date: 1950-12-01
Final Drill Date: 1950-12-14
Well Total Depth: 991.20 m
Surface Hole Latitude: 54.001517
Surface Hole Longitude: -113.121331

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-11-08 Obtained License
1950-12-12 Production Casing Operation Performed
1950-12-14 Finished Drilling
1950-12-14 Perforation Treatment Performed - Acid Wash - No Pressure
1950-12-14 Perforation Treatment Performed - Open-Hole Completion
1950-12-14 Well Mode changed to Drilled and Cased
1951-01-01 Well Began Production
1951-01-01 Well Fluid changed to Crude Oil
1951-01-01 Well Mode changed to Flowing
1951-03-02 Well Fluid changed to Crude Oil
1951-03-02 Well Mode changed to Pumping
1984-10-09 Perforation Treatment Performed - Cement Plug
1984-10-09 Perforation Treatment Performed - Open-Hole Completion
1986-04-03 Perforation Treatment Performed - Cement Plug
1986-04-03 Perforation Treatment Performed - Open-Hole Completion
1986-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-05-27 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-12-14 Open Hole/Barefoot Completion 972.90 991.20 0
1950-12-14 Acid Wash 972.90 991.20 0
1984-10-09 Cement Plug 981.50 991.20 0
1984-10-09 Open Hole/Barefoot Completion 972.90 981.50 0
1986-04-03 Cement Plug 977.20 981.50 0
1986-04-03 Open Hole/Barefoot Completion 972.90 977.20 0
1986-04-04 Acid Treatment 972.90 977.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1973 1914 0.0 0.0 0.0
1974 6382 0.0 0.0 0.0
1975 8439 0.0 0.0 0.0
1976 8657 0.0 0.0 0.0
1977 8341 0.0 0.0 0.0
1978 8076 0.0 0.0 0.0
1979 8225 0.0 0.0 0.0
1980 8327 0.0 0.0 0.0
1981 8505 0.0 0.0 0.0
1982 8412 0.0 0.0 0.0
1983 8082 0.0 0.0 0.0
1984 8256 0.0 0.0 0.0
1985 8719 0.0 0.0 0.0
1986 8384 0.0 0.0 0.0
1987 8080 0.0 0.0 0.0
1988 8136 0.0 0.0 0.0
1989 8473 0.0 0.0 0.0
1990 8426 0.0 0.0 0.0
1991 8716 0.0 0.0 0.0
1992 8418 0.0 0.0 0.0
1993 8678 0.0 0.0 0.0
1994 8098 0.0 0.0 0.0
1995 8558 0.0 0.0 0.0
1996 8744 0.0 0.0 0.0
1997 8726 0.0 0.0 0.0
1998 8571 0.0 0.0 0.0
1999 8404 0.0 0.0 0.0
2000 8582 0.0 0.0 0.0
2001 8646 0.0 0.0 0.0
2002 8163 0.0 0.0 0.0
2003 8631 0.0 0.0 0.0
2004 8703 0.0 0.0 0.0
2005 3726 0.0 0.0 0.0
2006 5603 0.0 0.0 0.0
2007 8711 0.0 0.0 0.0
2008 8500 0.0 0.0 0.0
2009 8280 0.0 0.0 0.0
2010 8614 0.0 0.0 0.0
2011 7728 0.0 0.0 0.0
2012 8424 0.0 0.0 0.0
2013 8079 0.0 0.0 0.0
2014 6535 0.0 0.0 0.0
2015 7993 0.0 0.0 0.0
2016 7779 0.0 0.0 0.0
2017 8719 0.0 0.0 0.0
2018 8112 0.0 0.0 0.0
2019 8010 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[5]

References