X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584210616000

Well Details

Well ID: 0584210616000
Loading map...
Location: 00/16-06-058-21W4/0
Location Alias: 00/16-06-58-21 W4M
Location Alias 2: 00/16-06-058-21 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 21
Section: 06
County/Municipality: Thorhild County
Well Name: IMPERIAL EGREMONT NO. 18
Operator Name: Imperial Oil Resources Limited
License Number: 0000704
License Date: 1949-10-03
License Status: RecCertified
Spud Date: 1949-10-20
Final Drill Date: 1949-11-01
Well Total Depth: 1003.40 m
Surface Hole Latitude: 53.990688
Surface Hole Longitude: -113.102989

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-10-03 Obtained License
1949-10-29 Production Casing Operation Performed
1949-11-01 Finished Drilling
1949-11-01 Perforation Treatment Performed - Open-Hole Completion
1949-11-01 Well Mode changed to Drilled and Cased
1949-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-11-03 Well Began Production
1949-11-03 Well Fluid changed to Crude Oil
1949-11-03 Well Mode changed to Flowing
1950-09-08 Well Fluid changed to Crude Oil
1950-09-08 Well Mode changed to Pumping
1983-07-01 Well Fluid changed to Crude Oil
1983-07-01 Well Mode changed to Suspended
1996-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-12 Perforation Treatment Performed - Jet Perforation
1996-03-12 Plug Back Performed
1996-03-12 Well Fluid changed to Crude Oil
1996-03-12 Well Log Performed
1996-03-12 Well Mode changed to Abandoned Zone
1996-06-04 Perforation Treatment Performed - Remedial Casing
1996-06-12 Well Abandoned
1996-06-12 Well Fluid changed to Crude Oil
1996-06-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-11-01 Open Hole/Barefoot Completion 957.10 1003.40 0
1949-11-02 Acid Treatment 957.10 1003.40 0
1996-03-12 Packing Device Capped w/Cement 934.00 942.00 0
1996-03-12 Perforation 221.00 222.00 13
1996-06-04 Remedial Casing Cementing 221.00 222.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1974 1957 0.0 0.0 0.0
1975 678 0.0 0.0 0.0

For data sources see[5]

References