If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0584142910034 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.035793,"lon":-112.044552,"icon":""}]} |
Location: 03/10-29-058-14W4/4 | |
Location Alias: 03/10-29-58-14 W4M | |
Location Alias 2: 03/10-29-058-14 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 4 | |
Range: 14 | |
Section: 29 | |
County/Municipality: Smoky Lake County | |
Well Name: SPL 2-29 HZ 103 WHITFORD 10-29-58-14 | |
Operator Name: Spur Petroleum Ltd. | |
License Number: 0483785 | |
License Date: 2017-06-01 | |
License Status: Issued | |
Spud Date: 2017-06-20 | |
Final Drill Date: 2017-06-24 | |
Well Total Depth: 1632.00 m | |
Surface Hole Latitude: 54.035793 | |
Surface Hole Longitude: -112.044552 |
Date | Event |
---|---|
2017-06-01 | Obtained License |
2017-06-20 | Surface Casing Operation Performed |
2017-06-21 | Direction Drilling Operation Performed - Deviate |
2017-06-21 | Direction Drilling Operation Performed - Horizontal |
2017-06-21 | Intermediate Casing Operation Performed |
2017-06-23 | Direction Drilling Operation Performed - Horizontal |
2017-06-24 | Direction Drilling Operation Performed - Horizontal |
2017-06-24 | Finished Drilling |
2017-06-24 | Well Log Performed |
2017-06-24 | Well Structure changed to Drain |
2017-06-25 | Rig Released |
2017-06-25 | Well Log Performed |
2017-07-14 | Perforation Treatment Performed - Open-Hole Completion |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2017-06-21 | 349.80 | Deviate (5 - 79 degrees) |
2017-06-21 | 681.10 | Horizontal |
2017-06-23 | 774.00 | Horizontal |
2017-06-24 | 886.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-07-14 | Open Hole/Barefoot Completion | 886.00 | 1632.00 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-06-25 | No Incident Encountered | 0.00 | 0.00 |
2017-07-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]