If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0584123110003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.058959,"lon":-111.770281,"icon":""}]} |
Location: 00/10-31-058-12W4/3 | |
Location Alias: 00/10-31-58-12 W4M | |
Location Alias 2: 00/10-31-058-12 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 4 | |
Range: 12 | |
Section: 31 | |
County/Municipality: Saddle Lake 125 | |
Well Name: CRESCENT POINT CACHE 10-31-58-12 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0050720 | |
License Date: 1974-08-02 | |
License Status: Abandoned | |
Spud Date: 1974-10-04 | |
Final Drill Date: 1974-10-07 | |
Well Total Depth: 676.70 m | |
Surface Hole Latitude: 54.058959 | |
Surface Hole Longitude: -111.770281 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1974-08-02 | Obtained License |
1974-10-07 | Finished Drilling |
1974-10-08 | Drill Stem Test Performed |
1974-10-09 | Drill Stem Test Performed |
1974-10-10 | Production Casing Operation Performed |
1974-11-10 | Perforation Treatment Performed - Jet Perforation |
1984-09-04 | Perforation Treatment Performed - Jet Perforation |
1995-12-27 | Perforation Treatment Performed - Cement Squeeze |
1995-12-28 | Perforation Treatment Performed - Jet Perforation |
1995-12-29 | Perforation Treatment Performed - Jet Perforation |
1995-12-29 | Well Log Performed |
1999-11-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-11-04 | Plug Back Performed |
1999-11-04 | Well Log Performed |
1999-11-05 | Perforation Treatment Performed - Jet Perforation |
1999-11-05 | Well Log Performed |
1999-11-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-11-09 | Perforation Treatment Performed - Jet Perforation |
1999-11-09 | Plug Back Performed |
1999-11-09 | Well Log Performed |
1999-11-09 | Well Mode changed to Drilled and Cased |
1999-11-10 | Well Began Production |
1999-11-10 | Well Fluid changed to Gas |
1999-11-10 | Well Mode changed to Flowing |
2014-09-01 | Well Fluid changed to Gas |
2014-09-01 | Well Mode changed to Suspended |
2016-06-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-06-22 | Plug Back Performed |
2016-06-22 | Well Fluid changed to Gas |
2016-06-22 | Well Log Performed |
2016-06-22 | Well Mode changed to Abandoned Zone |
2016-08-27 | Well Abandoned |
2016-08-27 | Well Fluid changed to Gas |
2016-08-27 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1974-11-10 | Perforation | 591.90 | 592.50 | 13 |
1999-11-09 | Packing Device Capped w/Cement | 474.00 | 482.00 | 0 |
1999-11-09 | Perforation | 448.80 | 450.80 | 17 |
2016-06-22 | Packing Device Capped w/Cement | 437.00 | 445.00 | 0 |
1984-09-04 | Perforation | 611.00 | 611.90 | 13 |
1995-12-27 | Cement Squeeze | 591.90 | 611.90 | 0 |
1995-12-28 | Perforation | 593.10 | 599.20 | 20 |
1995-12-29 | Perforation | 628.00 | 635.00 | 20 |
1999-11-04 | Packing Device Capped w/Cement | 612.00 | 620.00 | 0 |
1999-11-04 | Packing Device Capped w/Cement | 578.00 | 585.00 | 0 |
1999-11-05 | Perforation | 489.00 | 491.00 | 17 |
1999-11-05 | Perforation | 493.00 | 495.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 815 | 0.0 | 0.0 | 0.0 |
2000 | 7903 | 0.0 | 0.0 | 0.0 |
2002 | 5136 | 0.0 | 0.0 | 0.0 |
2003 | 4416 | 0.0 | 0.0 | 0.0 |
2004 | 8479 | 0.0 | 0.0 | 0.0 |
2005 | 7320 | 0.0 | 0.0 | 0.0 |
2006 | 8759 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8557 | 0.0 | 0.0 | 0.0 |
2009 | 7995 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 2059 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-06-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]