X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584122910000

Well Details

Well ID: 0584122910000
Loading map...
Location: 00/10-29-058-12W4/0
Location Alias: 00/10-29-58-12 W4M
Location Alias 2: 00/10-29-058-12 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 12
Section: 29
County/Municipality: Saddle Lake 125
Well Name: CRESCENT POINT CACHE 10-29-58-12
Operator Name: Crescent Point Energy Corp.
License Number: 0061256
License Date: 1976-11-23
License Status: Suspension
Spud Date: 1976-11-29
Final Drill Date: 1976-12-03
Well Total Depth: 666.30 m
Surface Hole Latitude: 54.043672
Surface Hole Longitude: -111.747120

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-11-23 Obtained License
1976-12-03 Finished Drilling
1976-12-04 Drill Stem Test Performed
1976-12-07 Production Casing Operation Performed
1976-12-08 Well Mode changed to Drilled and Cased
1977-08-10 Perforation Treatment Performed - Jet Perforation
1990-01-01 Well Began Production
1990-01-01 Well Fluid changed to Gas
1990-01-01 Well Mode changed to Flowing
1995-12-13 Perforation Treatment Performed - Jet Perforation
1995-12-20 Well Fluid changed to Gas
1995-12-20 Well Mode changed to Flowing
2003-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-08 Plug Back Performed
2003-11-08 Well Fluid changed to Gas
2003-11-08 Well Mode changed to Abandoned Zone
2003-11-09 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-08-10 Perforation 471.80 476.70 13
1995-12-13 Perforation 477.50 478.80 20
1995-12-13 Perforation 481.00 486.90 20
1995-12-13 Perforation 488.00 494.00 20
1995-12-13 Perforation 498.60 501.00 20
2003-11-08 Packing Device Capped w/Cement 462.00 470.00 0
2003-11-08 Packing Device Capped w/Cement 489.00 497.00 0
2003-11-09 Perforation 433.00 433.10 2
2003-11-09 Perforation 432.00 435.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 6347 0.0 0.0 0.0
1991 6914 0.0 0.0 0.0
1992 5355 0.0 0.0 0.0
1993 8740 0.0 0.0 0.0
1994 8442 0.0 0.0 0.0
1995 8326 0.0 0.0 0.0
1996 7980 0.0 0.0 0.0
1997 8687 0.0 0.0 0.0
1998 7181 0.0 0.0 0.0
1999 629 0.0 0.0 0.0
2000 3702 0.0 0.0 0.0
2001 715 0.0 0.0 0.0
2002 2208 0.0 0.0 0.0
2003 2952 0.0 0.0 0.0

For data sources see[5]

References