If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0584122910000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.043672,"lon":-111.74712,"icon":""}]} |
Location: 00/10-29-058-12W4/0 | |
Location Alias: 00/10-29-58-12 W4M | |
Location Alias 2: 00/10-29-058-12 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 4 | |
Range: 12 | |
Section: 29 | |
County/Municipality: Saddle Lake 125 | |
Well Name: CRESCENT POINT CACHE 10-29-58-12 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0061256 | |
License Date: 1976-11-23 | |
License Status: Suspension | |
Spud Date: 1976-11-29 | |
Final Drill Date: 1976-12-03 | |
Well Total Depth: 666.30 m | |
Surface Hole Latitude: 54.043672 | |
Surface Hole Longitude: -111.747120 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-11-23 | Obtained License |
1976-12-03 | Finished Drilling |
1976-12-04 | Drill Stem Test Performed |
1976-12-07 | Production Casing Operation Performed |
1976-12-08 | Well Mode changed to Drilled and Cased |
1977-08-10 | Perforation Treatment Performed - Jet Perforation |
1990-01-01 | Well Began Production |
1990-01-01 | Well Fluid changed to Gas |
1990-01-01 | Well Mode changed to Flowing |
1995-12-13 | Perforation Treatment Performed - Jet Perforation |
1995-12-20 | Well Fluid changed to Gas |
1995-12-20 | Well Mode changed to Flowing |
2003-11-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-11-08 | Plug Back Performed |
2003-11-08 | Well Fluid changed to Gas |
2003-11-08 | Well Mode changed to Abandoned Zone |
2003-11-09 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1977-08-10 | Perforation | 471.80 | 476.70 | 13 |
1995-12-13 | Perforation | 477.50 | 478.80 | 20 |
1995-12-13 | Perforation | 481.00 | 486.90 | 20 |
1995-12-13 | Perforation | 488.00 | 494.00 | 20 |
1995-12-13 | Perforation | 498.60 | 501.00 | 20 |
2003-11-08 | Packing Device Capped w/Cement | 462.00 | 470.00 | 0 |
2003-11-08 | Packing Device Capped w/Cement | 489.00 | 497.00 | 0 |
2003-11-09 | Perforation | 433.00 | 433.10 | 2 |
2003-11-09 | Perforation | 432.00 | 435.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 6347 | 0.0 | 0.0 | 0.0 |
1991 | 6914 | 0.0 | 0.0 | 0.0 |
1992 | 5355 | 0.0 | 0.0 | 0.0 |
1993 | 8740 | 0.0 | 0.0 | 0.0 |
1994 | 8442 | 0.0 | 0.0 | 0.0 |
1995 | 8326 | 0.0 | 0.0 | 0.0 |
1996 | 7980 | 0.0 | 0.0 | 0.0 |
1997 | 8687 | 0.0 | 0.0 | 0.0 |
1998 | 7181 | 0.0 | 0.0 | 0.0 |
1999 | 629 | 0.0 | 0.0 | 0.0 |
2000 | 3702 | 0.0 | 0.0 | 0.0 |
2001 | 715 | 0.0 | 0.0 | 0.0 |
2002 | 2208 | 0.0 | 0.0 | 0.0 |
2003 | 2952 | 0.0 | 0.0 | 0.0 |
For data sources see[5]